Innovative. Compact. Sustainable

A new wastewater treatment plant is being built in Weesp. The ICEAS treatment plant meets the highest standards, is compact and requires relatively little energy. This innovative treatment plant will ensure Weesp is ready for the future once again.
Waterschap Amstel, Gooi en Vecht is having the ICEAS treatment plant built on the site of the existing wastewater treatment plant (RWZI) in Weesp. This RWZI is outdated and will no longer be able to meet the discharge requirements for water discharge in 2020. Waterschap Amstel, Gooi en Vecht put the water treatment plant out to tender under the Uniform Administrative Conditions for Integrated Contracts (UAV-GC) for design & construction, with one year of maintenance. It set out the requirements the plant had to meet, leaving it to the contractors to develop the best solution.

Treatment tank for the ICEAS treatment process. (Image: Fabion)
Project start-up
“Waterschap Amstel, Gooi en Vecht ultimately chose ICEAS technology,” says Andre Edelenbos, CSO of the Moekotte Groep. “As many parties are involved in delivering a plant like this, the construction consortium first organised a project start-up after the contract had been awarded. The partners got to know one another better in an informal setting. Weekly meetings of the core team followed. The same parties work together as a team and share their expertise to deliver the best plant. The Moekotte Groep is responsible for the electrical installations.”
ICEAS
In the ICEAS treatment plant, the entire treatment process, including reaction, settling, decanting and stabilisation, takes place in a single tank. This contrasts with conventional water treatment plants, where the process is divided between several tanks. The new process saves space and construction costs, creating opportunities for, for example, future expansion. “The population of Weesp has grown considerably in recent years and is expected to keep growing,” says Wolter Wolthers, project manager at the Moekotte Groep. “With the treatment plant’s increased capacity and scope for expansion, Weesp will be ready for the future once again.”

Visualisation of the treatment plant. (Image: 3Dimensions vof)
Ready to start
The engineering firm produced the initial design, which was developed into a final design and then a construction design. Wolthers says: “The civil engineering contractor could then begin the building work, while the mechanical engineering contractor installed the equipment. The Moekotte Groep comes into the picture mainly when it is time to cable and connect the electrical installations.”
“Every project has its ups and downs, and this project was no exception,” Edelenbos admits. “We set ourselves a tight schedule. It was only achievable with perfect engineering in the preparatory phase. In practice, you have to deal with changes that delay the process. The positive side is that everyone kept talking to one another and we worked together to find solutions. All parties consistently kept the same goal in
sight.”
Question about this story? Ask your question
Who worked on ICEAS-zuivering Weesp
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWeesp ICEAS treatment plant
- SubjectSpecials