Specials

The structural challenges of a cycle parking garage

The structural challenges of a cycle parking garage

They describe themselves as integrated structural engineers. As an engineering consultancy, Verhoeven en Leenders is at home in both building engineering and civil engineering. These disciplines came together beautifully in the Strawinskylaan cycle parking garage project on Amsterdam’s Zuidas.  

In 2018, a new cycle parking garage was built in the most urban part of the Netherlands, Amsterdam’s Zuidas. The project involved building an underground cycle parking garage with space for 3,500 bicycles and redesigning Vijfhoek park. The main contractor was Van Boekel Bouw & Infra from Zeeland, a partner Verhoeven en Leenders works with frequently. “We are the structural engineers for many of their projects,” says engineer Corné van Weert. “From the very outset, we helped identify the most suitable construction options for this project. The Municipality of Amsterdam had two key requirements: to minimise disruption to the surrounding area during construction as much as possible, and to ensure the appearance and ease of use of the cycle parking garage. During the tender phase, we prepared the structural design for Van Boekel Bouw & Infra. After the contract was awarded, we undertook the project’s engineering as lead structural engineer.”

The entrance to the cycle parking facility

Underground challenges

Building underground also required a temporary construction pit made up of steel sheet piles and a bracing frame. “We also have the expertise in-house to find the best and most cost-effective solution for this. In addition, the many underground cables and pipes, as well as the limited working space, presented a number of challenges.”

Two disciplines in one

The result is a project the engineering consultancy is proud of. “wUrck was responsible for the architectural design. Although it is an underground garage, it is beautifully light both during the day and in the evening. It was a special project for us because it brought together two of our key disciplines: civil engineering and building engineering.     

Een zakelijke vraag aan Verhoeven Grondverzetmachines BV? Get in touch

Wie aan Fietsparkeergarage Strawinskylaan werkte

  1. structural engineerVerhoevenIn this story
  2. architectwUrckIn this story
  3. main contractorVan Boekel Bouw & InfraIn this story
  4. Lead structural engineerVerhoeven en LeendersMentioned in The structural challenges of a cycle parking facility

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectStrawinskylaan bicycle parking facility
  • SubjectSpecials
  • CompanyVerhoeven Grondverzetmachines BV
  • CompanywUrck architectuur stedenbouw landschap
  • CompanyVan Boekel Bouw & Infra
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.