The GOTIK method: what is it and what are its benefits?

The GOTIK method is used to manage specific aspects of project management. These aspects are Money, Organisation, Time, Information and Quality. Project-based working is a complex, all-encompassing way of working in the construction industry. Organisations often use a methodology that suits them, and the GOTIK principle is also regularly incorporated into methodologies.
GOTIK stands for:
- Money: the total financial resources needed to fund the project. In more detail: money is needed directly to deliver the project. Funding is also needed within the project itself, for the initiative, preparation, supervision of the works and aftercare.
- Organisation: the collective of people, companies, parties and other entities that can carry out activities within the project, as well as on its behalf from outside. This organisation is often set out in an organisational chart. It is important to specify the tasks, authority and responsibilities of each entity in the chart.
- Time: the time aspect of the project itself and all time-related aspects surrounding it. In more detail: time here means the time the project itself takes, along with all the time needed to initiate, prepare and deliver it, and the time required for aftercare.
- Information: all information available before the project, during the development phase, during the delivery phase and afterwards in the aftercare phase, including information received from outside and generated within the project.
- Quality: the full range of quality characteristics and quality safeguards needed to ensure the project is delivered successfully. In more detail: quality relates to the required standard of the final result, but also to how the project is delivered and how its various elements relate to one another.
The benefits of GOTIK
One benefit of the method is that its concise framework gives the five aspects a solid foundation for every project. Its drawback is that it only provides tools for keeping those five aspects under control. In principle, it is possible to deliver a successful project using the “GOTIK” method that ultimately fails to meet the requirements of the client with a stake in the project’s success.
GOTIK or GROTIK
This is why there are calls to add at least one extra letter to the “GOTIK” method: D for Doel (objective), the defined end result to be achieved within the given time, budget and quality parameters, based on the available information and using the available organisation.