Following earlier collaborations on projects including the N3, A50 and A4, Heijmans has once again called on Alara-Lukagro’s expertise for the widening of the A1. The specialist in bespoke noise and sound control has been commissioned to supply nine acoustic screen doors with emergency escape features for the A1 Apeldoorn - Twello project. For the previous A1 Apeldoorn - Azelo project, three doors had already been
made to measure, supplied and installed.
Alara-Lukagro’s doors in the noise barriers along the A1 serve two purposes. In an emergency, people can use them to leave the motorway safely. The doors also give the emergency services efficient access to the motorway from the residential side. “We supplied the first batch of doors in 2020 and the second in 2023,” says Ronald van Ditshuizen, account manager at Alara-Lukagro. “Originally, our construction business unit supplied acoustic doors, grilles and walls. Over the years, these have been supplemented with all kinds of additional features, either individually or in combination, such as fire resistance, burglar resistance, or emergency escape functionality, as well as other specific features. We can supply both standard products and bespoke solutions. The latter is our strength. We are resourceful and work with clients to find solutions.”

Sheet steel
An emergency escape door is installed every 400 metres in a noise barrier, so that people need travel no more than 200 metres in an emergency. “As these are noise barriers, the doors also need to provide sound insulation and seal properly against the frame,” says Pieter Hanselaar, project engineer at Alara-Lukagro. “In this case, we used 80 mm sheet-steel doors with an acoustic core and a rubber seal all the way round. On the road side, the door has a handle with a panic function, while on the residential side it has a fixed knob. The emergency services can unlock the mechanical lock with a special triangular key. The door also has a closer, so it automatically latches after use, and a retaining chain to restrict how far it can open.”

Opening dimensions
Alara-Lukagro supplied the doors ready-prepared in steel frames, also acoustically insulated, so that the complete units could be easily installed on site in the openings in the noise barrier. “For projects like this, we essentially have two options,” Pieter explains. “We can base the drawings on the actual site conditions, measuring the door opening on site, or we can specify the opening dimensions on the drawings so that the contractor can allow for them when building the noise barrier. To meet the programme, Heijmans chose the second option for the A1.” Alara-Lukagro then installed the doors on site in several phases: three in 2020 for the A1 Apeldoorn - Azelo project, two in 2023 for the A1 Apeldoorn - Twello project, and the remaining seven were or are being installed in 2024. “Installation is carried out in close consultation with Heijmans, which closes off a section of road to ensure the safety of our fitters.”

Acoustic performance
The doors and frames have a two-coat wet paint system with a minimum coating thickness of 220 µm, in the RAL colour specified by the client, RAL 7039 (quartz grey). The mechanical lock and door closer also have a special coating, making the complete assembly highly resistant to the elements, Ronald says. “As well as the door and frame, we acoustically sealed the connection between the frame and the noise barrier, ensuring a seamless finish. In this case, the required acoustic performance was 25 dB.” It is worth noting that Alara-Lukagro can supply acoustic doors that reduce noise by much more. These are used, for example, in cinemas, studios and theatres, where they can attenuate sound by up to 56 dB. “We also sometimes take on very challenging infrastructure projects, especially noise barriers alongside railway lines where sound waves need to be absorbed. That is well within our capabilities too. We are not afraid of a challenge.”
A business enquiry for Alara-Lukagro? Get in touch
Who worked on A1 Apeldoorn – Twello
- construction companyHeijmansMentioned in Sustainable widening of the A1 between Apeldoorn and Twello
- geotechnical ground investigationVWB Het VeldwerkbureauMentioned in Geotechnical ground investigation by local specialist
- temporary road lightingLokhoffMentioned in Safety above all, thanks to smart temporary road lighting