Foundations / Site investigation

Vibration-free piling, with no noise nuisance and minimal soil arisings

Nederfund is de partij voor zowel het kleine precisiewerk als voor de grote bouw- en infrastructurele projecten.
Nederfund is de partij voor zowel het kleine precisiewerk als voor de grote bouw- en infrastructurele projecten.

For projects where vibration and noise nuisance must be kept to a minimum, the grout screw pile is generally an ideal foundation system. Nederfund specialises in installing these grout screw piles, as well as screw injection piles, and made substantial investments last year to further expand and make its plant fleet more sustainable.

Nederfund began drilling grout screw piles and screw injection piles in 2007. The company, based in Wijchen, can rightly call itself a specialist in this field. It has a flat organisational structure and is fortunate to have skilled staff and experienced operators who know their trade. A foundation plan on paper may look straightforward, but site conditions can throw up unexpected surprises. Nederfund is uniquely equipped to respond flexibly. Everything is geared towards a perfect end result.

The 1712 grout screw piling rig weighs 17 tonnes and can drill piles up to 11 metres long.

Broadly certified

Nederfund is the go-to contractor for both small-scale precision work and major construction and infrastructure projects. The company is VCA* certified and a member of the NVAF (Dutch Association of Foundation Contractors). In recent years in particular, it has invested heavily in its plant fleet. This enables it to work in areas with restricted headroom or at difficult-to-reach sites, while also drilling long piles on a large scale, up to 27 metres. Specialist work, such as drilling alongside railway lines or in contaminated ground, is no problem for Nederfund either. Its employees also hold all the required certificates.

New rigs

In 2022, Nederfund brought two new rigs into service. The 1712 grout screw piling rig weighs 17 tonnes and can drill piles up to 11 metres long, while the 4322 weighs 50 tonnes and can drill piles up to a maximum length of 20 metres. Both machines naturally meet the latest emissions standards and are fitted with an automated drilling data recording system. The data is used to produce drilling graphs and logs, making it possible to demonstrate the quality of the work after completion. Nederfund used these new machines, among other projects, to build the foundations for the WoonDroom project in Wijchen and the Driegaarden development in Huissen. In addition to the two new rigs, the company has four existing rigs, enabling it to carry out a wide range of foundation work with piles up to 27 metres long.

The schedule for the coming period is full. Nederfund’s ambition is not only to continue growing steadily, but also to focus on emission-free piling. The market is not quite ready yet, but developments are being monitored closely. 

A business enquiry for Nederfund? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeUnderground construction
  • SubjectFoundations / Site investigation
  • CompanyNederfund
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.