Foundations / Site investigation
Specialist in cofferdams and reinforced soil strengthens its foundations
Text Roel van Gils Images Bonneveld

Growth, collaboration and targeted investment
Recent years have been marked by growth, professionalisation and a further strengthening of Bonneveld’s position in cofferdams and reinforced soil structures. This has paid off handsomely for the company. That upward trajectory will continue apace in 2026, with clear choices on people and equipment, and above all on collaboration.
Last year, the team grew from 65 to 80 employees. “That was a major step, necessary to meet the growing scale and complexity of projects,” says Anco van der Heiden. He runs the family business alongside his brother Leon, their father Harry and equal partner Stefan Albers. “Projects are getting bigger, which calls for more capacity and expertise. With six project planners now working in the office, we devote considerable attention to scheduling, preparation, inspections and coordination at the outset of projects. Clients greatly appreciate this careful preparation.”

Building closer relationships
According to Anco, the focus in the coming period will be firmly on deepening relationships with existing clients. “We’re fortunate to have long-standing clients with whom we’ve worked successfully for many years.” Bonneveld is increasingly brought in as a tender partner on major infrastructure and rail projects, including the A10, the Nieuwe Meer interchange and projects around Amsterdam Centraal. “Thorough cost estimating and detailed project preparation help us identify risks early and minimise surprises during construction,” says Leon.
EPS for temporary structures
The Bonneveld Gewapende Grondconstructies division is also working at full capacity. “We’re seeing reinforced soil structures and lightweight fill materials such as EPS used in an increasingly wide range of applications, including temporary works,” says Leon. “We handle the whole process, from designing, supplying and installing the EPS structure to removing it, taking it back and putting it to use elsewhere. That way, we’re actively helping to close the sustainability loop. We do this through a strong partnership with the Joosten Groep.”

New machinery
The scale of projects also calls for a different scale of equipment. That is why, in April 2026, Bonneveld will take delivery of its largest crawler excavator: a 65-tonne CAT 352 LRE with a 19-metre long reach. “This machine is ideally suited to the increasingly deep construction and underwater cofferdams, which range from 5 to as much as 20 metres deep,” explains Anco. “Its extra reach and capacity will enable us to carry out this work more efficiently and safely. We have also opted for a full rebuild of two existing CAT 340 crawler excavators. Our previous experience with rebuilds has been very positive: after overhaul, the machines went on to work reliably for another 10,000 hours.”

Zero-emission equipment
Alongside this heavy, large-scale machinery, Bonneveld now has a broad range of zero-emission equipment, including vibratory rammers, an access platform, a mini-loader, a 10-tonne midi excavator and a 25-tonne crawler excavator. “So we can carry out some of our work entirely emission-free when clients require it.”
With a new website, growing teams, new machinery and stronger partnerships with leading industry players (more on that later, ed.), Bonneveld will strengthen its foundations in cofferdams and reinforced soil structures in 2026.
A business enquiry for Bonneveld BV? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeUnderground construction
- SubjectFoundations / Site investigation
- CompanyBonneveld BV
- CompanyJoosten Groep


















