A growing number of foundation contractors are choosing not to invest in their own grouting equipment, instead hiring the machine that will boost productivity for the job in hand. Inpieq, founded in 2008 by Frank van Deursen, is responding with a rental range centred on compact, fully automated grout units and smart accessories. The company also develops and supplies its own drilling and piling rigs, including the small IFD 2 for confined urban sites.
The IGP 150 is the rental favourite for medium-sized projects. With a pump flow of 150 litres per minute at 90 bar, it delivers exactly the power needed for continuous operation. It has a mixing capacity of 250 litres, a storage capacity of 800 litres and can mix approximately 10 cubic metres of grout per hour. This makes the IGP 150 compact enough for busy construction sites, yet powerful enough to keep working without interruption. Its upgraded plunger pump ensures a stable, pulse-free flow, resulting in even injection and high daily output.



Capacity for large-scale projects
For large-scale grouting or micropile projects, the IGP 300 offers the required capacity. This unit has a pump flow of 300 litres per minute at 90 bar and a mixing capacity of 500 litres. Its storage capacity ranges from 1,000 to 1,500 litres, enabling the IGP 300 to produce approximately 20 cubic metres of grout per hour. Here too, fully automated mixing and pumping, combined with the integrated water tank, mean that crews do not depend on an external water supply or face unnecessary waiting times. Frank van Deursen puts it simply: “You lose the least time when the unit is self-sufficient and the operator can start the right mix at the touch of a button. Pre-programming ten mixes and switching between them during the job? That saves hours over the course of a week.”



Pressure spikes
Alongside the IGP units, the rental fleet also includes the GAC (Groutpomp Accu Compensator). This pressure accumulator smooths out pressure spikes in the grouting system, reducing mechanical stress on the grout pump. This extends hose life and ensures a more consistent discharge. The GAC 10 has a maximum volume of 10 litres and can handle an operating pressure of up to 400 bar, while the GAC 15 has a volume of 15 litres and is suitable for operating pressures of up to 250 bar. The GAC is brand-independent and can be used downstream of any grout pump. In practice, it is often hired together with the IGP 150 or IGP 300 to keep the system stable when injection resistance varies.
Small but powerful
Not every job calls for a large rig. The IFD 2 is the smallest drilling rig developed in-house: compact, manoeuvrable and designed for work in construction pits, basements or urban streets where low-vibration or vibration-free working is required. It has a maximum drilling torque of 20 kNm and can handle pipe sizes from 114 to 219 millimetres. With a transport weight of 1,980 kilograms, the IFD 2 is easy to move. The rig is radio-controlled, can be supplied with an electrically powered hydraulic power pack and can be combined with the DLS data logging system. Its compact dimensions, low-emission options and comprehensive data logging make it particularly suited to foundation repairs in existing buildings.
Van Deursen: “Urban work is all about mobility, flexibility and compact construction. That is exactly the field our machines are designed for, and where our rental customers make the difference.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeUnderground construction
- SubjectFoundations / Site investigation