Foundations / Site investigation
25 years of expertise in foundations and (specialist) anchoring
Text Roel van Gils Image De Vries Titan

For more than 25 years, De Vries Titan has been a respected name in the foundations and anchoring sector. The company has built a strong reputation over the years, with a loyal client base that calls on it especially when projects become truly complex. This is where De Vries Titan makes the difference: working alongside clients to deliver the best solutions, even in challenging conditions. Managing Director Hendrik van de Woestijne gives us an insight into the business.
De Vries Titan has a close-knit core team of skilled professionals and a modern fleet of machinery, with the capacity to scale up when projects require it. “We operate across the Netherlands and Belgium, and occasionally also take on projects in Germany,” says Van de Woestijne.
Grouted anchors and anchor piles
“We have traditionally specialised in installing grouted anchors and anchor piles, particularly in infrastructure and commercial construction,” says the managing director enthusiastically. “Projects include underground construction, building pits and quay walls. A notable example is our contribution to the A9 project, where we completed a huge amount of work alongside a fellow contractor. We also installed grouted anchors in a large building pit for the new nuclear power station in Petten. Work will soon begin on the foundations for a second building pit, using anchor piles. We are currently working on a riverbank project in Alphen aan den Rijn and the surrounding area for our sister company De Vries Werkendam. Several kilometres of bank protection are being replaced, and we are anchoring it with more than a thousand grouted anchors in total. The project is being carried out entirely from the water.”

Strand anchors
“Clients tend to approach us when a project is more complex or presents greater challenges,” says Van de Woestijne. “We are also known for specialist techniques. Installing high-strength steel strand anchors is a specialist skill. It is technically very challenging. Many of our competitors are less keen to take on this kind of work, whereas it is one of our areas of expertise. The technique also helps reduce the environmental footprint, as it requires far less steel. In urban areas, where temporary structures may be needed to build a basement, for example, strand anchors offer the further advantage that they can be removed completely once the work is finished.”
Innovation
As well as delivering projects, De Vries Titan is investing in the future. The company is working hard to electrify its fleet of machinery, an important step towards reducing CO2 emissions. Although the transition is complex because of the machines’ high power requirements and hydraulic systems, Van de Woestijne expects to install the first anchors fully electrically next year. The company is also investing in new techniques, such as refurbishing and optimising a rig for overhead anchor drilling. “This will enable us to serve our clients even better and steadily build on the strong reputation we have established over the past 25 years.”
The schedule is already filling up nicely. “In 2026, we will start work on the extension of the A15 near Zevenaar (ViA15), a project requiring more than five thousand anchors. This large-scale project is expected to take a year and will require several rigs and close collaboration with other parties,” explains Van de Woestijne. “The ground conditions are very different from those on the A9 in Amstelveen, where we are dealing mainly with soft layers and fine sand. That variety makes our work varied and challenging.”
A business enquiry for De Vries Werkendam? Get in touch
Who worked on ViA15
- ground investigationLankelma IngenieursbureauMentioned in Project Via15 | On land, on water and on rail
- cable and pipeline processVHW EngineeringMentioned in It takes time, diplomacy and technical expertise
- modular bridges
Retro BridgeMentioned in Eight modular bridges keep the complex ViA15 infrastructure project moving - foundation specialist
KandtMentioned in 4.8 kilometres of sheet piling under strict noise and vibration limits
Keep following this
Get an email when a new story is published. No account needed.
- ProjectViA15
- SubjectFoundations / Site investigation
- CompanyDe Vries Werkendam
- CompanyDe Vries Titan B.V.