Long-awaited noise barrier along the A20 in Maassluis

With the first section of the noise barrier along the A20 in Maassluis now complete, noise pollution from the motorway has already fallen.
Work began last autumn to replace the old wooden barrier on the earth embankment alongside the A20 with a sustainable noise barrier. It is not only aesthetically pleasing, but also offers ecological benefits. Most importantly, it protects against the ever-increasing noise pollution from the motorway.
The barrier, approximately 170 metres long and 6.5 metres high, was installed on behalf of the municipality of Maassluis by Kokosystems of Poeldijk, together with Van Schie Groep of Mijdrecht. Arjan Kick, project manager at Kokosystems: “The prefabricated Kokowall and Kokowall HA-Minwol noise barriers are structures with high sound insulation and absorption values. The noise barriers are fitted with a row of natural coconut tubes on one or both sides. The Kokowall HA-Minwol noise barrier has a layer of sound-absorbing mineral wool on one side, finished with several layers of mesh. The noise barrier is ideally suited to being covered with climbing plants.” The Kokowall® system is a Dutch invention and is manufactured entirely in the Netherlands. “It scores highly in EMVI tender processes,” adds Kick.
Second section
The second section of the barrier, along a residential area on the Kastanjedal-Doornenbuurt route, will follow this summer. The noise barrier there is approximately 510 metres long and 3.5 metres high, and will be installed on the existing noise bund. It will have the same appearance, creating a uniform look along the entire length of approximately 700 metres. More importantly, the ‘green’ noise barrier blocks motorway noise at source, benefiting local residents.”

Excellent collaboration
“It may have taken a long time to get the project off the ground, but construction itself went very smoothly,” says Kick. He points, among other things, to Lely’s constructive approach. Not only did it make the land available, enabling the allotments to be preserved as far as possible, it also made it possible for the work to take place alongside construction of the second phase of the Lely Campus. “Good collaboration between the municipality of Maassluis, Kokosystems, Van Schie and Lely, as well as the board and allotment holders of allotment association Vluchtheuvel, helped ensure that everything went to everyone’s satisfaction.”
Extension of noise bund at Floriade
Alongside this project, Kokosystems is busy extending a noise barrier on the earth embankment alongside the A6 at the Floriade site in Almere. Kick: “A barrier no less than 690 metres long and 3 metres high, with Kokowall on both sides and additional absorption on the noise-facing side. A unique project, in which the international event, the Floriade World Horticultural Expo, will ultimately form part of the wider area development. Dura Vermeer will then develop the site further for housing.” Kick concludes: “It makes sense to build a natural noise barrier. It’s fantastic that we’ve been given the opportunity to do so!”
A business enquiry for Van Schie? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectRoad construction
- CompanyVan Schie