Geotechnical investigation with a cone penetration test platform.
Geotechnical investigation with a cone penetration test platform.

As an interdisciplinary provider of engineering services and field investigations, Geonius was brought in at an early stage of the A2 widening project. The project demonstrates the company’s versatility and shows how one discipline became the catalyst for broad, multidisciplinary collaboration.

In mid-2023, Geonius’s Infra division joined Boskalis’s design team. Two road designers and a draughtsperson were seconded to the project, where they worked on the preliminary and detailed designs. “The road design covered not only the pavement, but also the earthworks and modelling of the entire design,” says Rutger Ros, road designer at Geonius. “The design had to comply with the guidelines, while also being buildable and cost-effective. Our experience of projects of this scale, with the complex phasing they require, also led us to focus on the interaction between the temporary and final situations. The temporary situation was considered at an early stage in the final design as an interface, helping to prevent construction challenges.”

Environmental soil investigation

Geonius’s Environment division was also brought in at an early stage to carry out environmental soil investigations. “Several sites were suspected of being contaminated, so we set about investigating them,” says Rick Tempels, environmental project manager at Geonius. “As the project progressed, more sites were identified as potentially contaminated. Boskalis therefore asked us to carry out an extensive historical desk study, which ultimately increased the scope of our original assignment fivefold. Contamination found on the plots ranged from asbestos and heavy metals to traces of former industrial activity and, occasionally, unexploded ordnance.”

Investigating the ground

For the road widening and the construction of gantries, structures and wildlife crossings, Geonius’s Geotechnics division carried out between 200 and 250 cone penetration tests, as well as various boreholes. “Some of the work took place at hard-to-reach locations and in challenging conditions,” says Kevin Kalisz, geotechnical project manager at Geonius, drawing on his experience. “During WeekendBreek, the 56-hour closure of the A2, for example, we carried out cone penetration tests on a slope among the trees. All the CPT rods had to be carried down by hand. At other locations, we used a CPT platform mounted on a crane on a slope, and of course our CPT rigs were also in frequent use. During WeekendBreek, five fieldwork crews were working at the same time. It was an intensive job, but we’re proud to have pulled it off. Hats off to our field staff for their efforts. A lot was asked of them.”

The Geonius Environment team carries out mechanical drilling for soil investigations.

In-house laboratory

One of Geonius’s key strengths is its in-house geotechnical laboratory. All soil samples were analysed at the Geolab. Tests including oedometer tests, particle size distribution tests and triaxial tests provided essential input for the structural design. “Having our own laboratory means our clients are not dependent on waiting times, and we can coordinate directly,” adds Kalisz.

Setting out

Geodesy has been involved in the project since February 2024. “We started by mapping the existing infrastructure and viaducts, establishing a stable survey control network, and setting out the work limits and cables and pipelines,” says Erik van Eert, Geodesy manager. “As construction got under way, we provided the necessary coordination. The Geodesy department acts as the link between design and delivery. Our team carries out setting-out and surveying work and supports the survey team during construction. This ensures that everything is built in the right place and within the specified tolerances. We had a large team of setting-out engineers on site during WeekendBreek, supporting the construction work.”

This project shows what Geonius does best: its flexibility and ability to operate as one organisation. “Our people are fully integrated into Boskalis’s project teams. If new questions arise, we can respond quickly and bring in additional expertise.”

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectRoad construction