Civil structures engineering for ProRail project Haren Underpass

A new, modern underpass at Haren station will provide a safe connection for cyclists and pedestrians between the western part of Haren and Oosterhaar. The entire station area is also being upgraded, from the sewer system to the layout of the station and station square.
Until summer 2017, Ingenieursbureau Boorsma worked with the project contractor, Reimert Bouw en Infrastructuur, on the tender design for the underpass. After the contract was awarded, Boorsma first set out all the main dimensions and materials for the civil engineering and geotechnical components in the Final Design (DO), then prepared all the required formwork and reinforcement drawings in the Construction Design (UO).
A multidisciplinary, knowledgeable and collaborative consultancy
Ingenieursbureau Boorsma, a consultancy working across a range of disciplines in civil engineering and construction, has around fifty employees based in Drachten, Amersfoort and Urk. Anne Jan Breimer, responsible for design management on the Haren project, explains: “Our consultancy was founded in 1969 by Kees Boorsma. This year we are celebrating our fiftieth anniversary. We have a total of eight disciplines: Building Engineering, Structures, Building Physics, Hydraulic Engineering, Infrastructure, Construction Management, Environment and Geology. We work across a broad range of projects involving movable bridges and locks, as well as building engineering. For example, we contributed to the preparation of plans for the bridges and lock gates for Sluis Terneuzen and were involved in repair work on the weir at Grave, which had been struck by a vessel. In building engineering and structural design, we have now delivered a number of IKEA stores. The most recent were IKEA Zwolle and IKEA Utrecht. As we work for both the public sector (Rijkswaterstaat, provinces and water boards) and contractors, we cover the full breadth of the market.”
Haren Underpass project
“Designing an underpass such as the one in Haren is right up our street. At the start of the DO phase, we held several working sessions with ProRail and later with the municipality of Haren. Holding these at the outset helped secure broad support for the design among all the parties. We arrived at improved solutions on several points compared with the tender design. This was possible by taking a broader view of aspects such as safety, accessibility and maintainability. For example, the entrance to the pump chamber was moved to the south, which suited the municipality because it made maintaining the pumps in the chamber easier. Our many years of experience with movable bridges, locks and weirs, where we take the maintenance of installations into account from the outset, also meant we were well placed to advise on this. The dimensions of the underpass were also further optimised, which benefited contractor Reimert in terms of the volume of concrete and reinforcing steel required, in m3.”
The underpass is a cast in situ concrete structure comprising a floor and walls (500 mm thick on average, C30/37). The 700 mm thick railway decks (C35/45) are prestressed, prefabricated on site and then moved into position or lifted into place. Design management for the Haren project was led by ir. Anne Jan Breimer, working with colleagues ing. Korné Soldaat (railway deck structural engineer), ing. Jeroen de Boo BSEng (underpass structural engineer), ing. Erik Jonker (underwater concrete structural engineer and checker) and Patrick Kok (3D Revit modeller).

Artist’s impression of Haren station. (Image: ProRail)
Significant responsibility as lead structural engineer
Anne Jan continues: “Boorsma was responsible for the lead structural engineer role on the Haren project. We therefore also checked drawings and calculations produced by third parties. For the temporary sheet pile walls, we checked calculations, reviewed interfaces and coordinated them with the various parties involved. Since we provide advice across a wide range of disciplines, our involvement extends beyond civil engineering structures alone. For contractor Reimert, this meant having a single point of contact and therefore direct lines of communication.”
There are not many consultancies of this size with in-house expertise in both steel and concrete structures, for example for a movable bridge, including its operating mechanisms. “At times, the project was hectic,” says Anne Jan, “for example when a question about the drawings came in shortly before a railway possession (TVP), even though the documents had already been approved. By responding promptly and discussing the matter, we were able to resolve these ad hoc situations together. To learn from every experience and always do our best, we have put together a ‘lessons learned’ file. We can use it again on future projects.”
Official ProRail recognition
“In the past, we designed several major railway projects as part of a consortium under integrated contracts. However, we had not yet received official recognition. ProRail has designated the Haren Underpass project as a recognition project. Now that we have received recognition, we can work directly for contractors on railway projects. These are projects under integrated contracts for both rail-bearing and non-rail-bearing structures,” Anne Jan concludes proudly.
Question about this story? Ask your question
Who worked on it
Onderdoorgang Haren in Oss
- Lead structural engineerIngenieursbureau Boorsma
- contractorReimert Bouw en Infrastructuur
Keep following this
Get an email when a new story is published. No account needed.
- ProjectOnderdoorgang Haren
- SubjectRoad construction
- CompanyIngenieursbureau Boorsma
- CompanyReimert Bouw en Infrastructuur