The pen

BIM for infrastructure projects

Joost Bolkenstein – Salesmanager Thinkproject Benelux
Joost Bolkenstein – Salesmanager Thinkproject Benelux

Infrastructure and civil engineering projects continue to face intense pressure. We are seeing lower budgets at provincial and municipal level, while more and more work has to be delivered in less time. As well as lower budgets, expectations for the quality of the living environment are also higher. In practice, these challenges are often addressed by issuing innovative tenders or, for example, through Public-Private Partnerships (PPPs). These contract forms place considerable demands on the contractor. After all, the contractor is ultimately responsible for delivering the project correctly, from start to finish, on time and within budget.

Improve collaboration and minimise the costs of failure

We are also increasingly seeing the entire maintenance phase become the contractor’s responsibility. To achieve a good return during this phase, digitalisation is essential. By visualising the project and linking it to the programme, it is possible to check during the preparation and design phase whether everything is progressing as planned. This is also the phase when decisions can still be made. The BIM model immediately shows how a particular choice will affect the amount of additional or reduced work, and what impact it will have on the programme.

The BIM model is a 3D model that can easily be shared with the construction team and other stakeholders. For example, if you widen a road or relocate an entrance or exit slip road, you can use the BIM model at an information meeting to show that this was the right choice. The 3D BIM model also lets you compare different options at an early stage and quickly visualise the consequences of a decision. These might include the positioning of traffic lights, an additional cycle lane or even the construction of an extra lane.

By converting the design model into an IFC BIM model, all parties can view it and add comments directly. Suppliers can easily extract various types of data from the model, such as quantities, to prepare a competitive tender. You can even draw on suppliers’ expertise to propose alternatives. The model immediately shows the impact on the programme and budget. This means you genuinely involve all partners in the project, building support and trust.

A well-constructed BIM model contains a wealth of information, as data is available for every building component. This gives the entire construction team more opportunities to work efficiently. Changes can be made directly to the model and the drawings linked to it, including the programme. This prevents errors and makes the ordering of construction materials more efficient. Raw materials are becoming increasingly difficult to obtain across the construction sector. The BIM model can show where these scarce materials are located, while the software provides additional monitoring and dashboarding throughout the construction process. That means no more unnecessary delays.

In infrastructure projects, the costs of failure still account for between 5 and 10 per cent. The main reasons are miscommunication and the use of too many different data sources. Working with BIM makes it possible to identify potential construction errors and other risks at an early stage. Linking the model to the programme ensures all materials are on site when needed, avoiding unnecessary delays.

By working with BIM from the outset, you will literally and figuratively reap the benefits during the maintenance phase. The full history and documentation are linked to the BIM model, so there is no need to sift through external folders. Warranties, certificates, specifications, documents and even handover items are easy to find in the BIM model, which can be accessed on mobile devices.

Choosing BIM software is certainly not a straightforward decision, and it has a major impact on your organisation. We see this with our customers who choose Thinkproject. As a sales manager at Thinkproject, I am naturally a little biased. Nevertheless, if you feel my thoughts have been useful, do let me know.    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectThe pen
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.