VR/AR and BIM are future-proofing our industry!

Economic growth continues and the need to innovate is greater than ever. Growing pressure on infrastructure and rising demand for smarter, cheaper solutions are the challenges of the future. This calls for new skills. So the question is: are you joining the hype, or are you truly future-proof?
Jeffrey van Tol, BIM manager at TBI company Mobilis, has a clear answer: “Change in the construction sector is accelerating. 3D modelling, parametric design, cloud-based software solutions, drones, 3D printing, VR/AR and mobile mapping: it’s all here.” Civil engineering contractor Mobilis focuses on innovation within the organisation and across projects in infrastructure, water management and industry.

VR also creates a more immersive experience for the client. (Image: Vincent Basler)
Saving time and money
“When used correctly, these modern technologies help the construction sector save considerable amounts of time and money. We create a virtual representation of the existing environment, the end result and the steps in between. This gives both clients and the communities around construction projects greater insight and a more immersive experience. The measurements we take provide the basis for design, visualisations, planning, volume calculations and more. Virtual construction enables faster decision-making and can lead to better decisions. Problems are also identified sooner, allowing us to anticipate them. And using VR also creates a more immersive experience for the client. In the same way, AR instructions help construction teams stay on track and ensure the quality of their work. The data collected can be used in a shared data environment: BIM (Building Information Modelling). The insights gained make the work more efficient and improve the end product,” says Jeffrey.
BIM: a key role in complex projects
“BIM is playing an increasingly essential role in actual projects. The BIM process is not the same for every project: it can be tailored to what is needed or what the client requires,” Jeffrey continues. “We create our own BIM environment, where all information about the various project disciplines is stored, shared, used and managed throughout the construction process. This gives us considerable insight, allowing us to provide advice at an early stage and make certain decisions. The various disciplines involved in an integrated construction project are much easier to manage because we know when coordination between them is needed. Clients and stakeholders review the BIM model to validate it: are they getting what they expect?”

The Rijnlandroute coordination model was used for reviews, visualising interfaces and validation with the client and stakeholders.
Digital Twin
“Mobilis goes one step further,” Jeffrey continues. “Together with Croonwolter&dros, we validate the operation of specific systems by linking the system architecture to the virtual model. This so-called Digital Twin is used to predict, test and potentially manage systems. We can simulate incidents and use the insights gained to improve the design. This saves a great deal of time, enables better planning, reduces costs and makes the testing and handover process smoother.”
Rijnlandroute
“During the tender phase of this project, visualisations were created at various junctions along the route, allowing the client to look around in 360 degrees. The integrated coordination model was used extensively during the design phase and also served as the basis for the Digital Twin. The tunnel system’s operation was demonstrated in various scenarios. A virtual driving experience was also created for the different road layouts during construction, allowing the driving behaviour of road users to be validated.” Jeffrey concludes: “You have to get phased, integrated construction right, and having a single central source of information is essential. Mobilis has proved to be very future-proof in this respect.”
Have a business enquiry for Mobilis? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeDigitalisation from design to construction
- SubjectBouwMat
- CompanyMobilis
- CompanyCroonwolter&dros


















