Kandt Aannemings- en Funderingsbedrijf gets to work with multiple sheet piling and drilling rigs

A great overview photo of the Kronenburg sub-area on the Amstelveenlijn. It shows Kandt Aannemings- en Funderingsbedrijf B.V. working with multiple sheet piling and drilling rigs.
The project also places considerable demands on logistics, as both the roads and tramway remain in use. As a result, we have to carry out work in confined spaces on a number of sections.
We are also installing some of the grout injection piles and all the sheet piles at the Zonnestein and Sportlaan sites. These foundation works will form the basis for the construction of the new grade-separated junctions.