BouwMat

Kandt Aannemings- en Funderingsbedrijf at work with multiple sheet piling and drilling rigs

Kandt Aannemings- en Funderingsbedrijf at work with multiple sheet piling and drilling rigs

A great overview photo of the Kronenburg sub-location on the Amstelveen Line. It shows Kandt Aannemings- en Funderingsbedrijf B.V. at work with multiple sheet piling and drilling rigs.

The work also poses significant logistical challenges, as both the roads and the tramway remain in use. As a result, we have to carry out work in confined spaces on a number of sections.

We are also installing some of the grout-injected piles and all the sheet piling at the Zonnestein and Sportlaan locations. These foundation works form the basis for the construction of the new grade-separated junctions.

A business enquiry for Kandt Aannemings- en Funderingsbedrijf BV? Get in touch

Who worked on Amstelveenlijn

  1. Sheet piling and drilling rigsKandt Aannemings- en FunderingsbedrijfMentioned in Kandt Aannemings- en Funderingsbedrijf gets to work with multiple sheet piling and drilling rigs
  2. main contractorVITALMentioned in A range of disciplines involved in the Amstelveenlijn renewal

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAmstelveenlijn
  • ThemeUnderground construction
  • SubjectBouwMat
  • CompanyKandt Aannemings- en Funderingsbedrijf BV
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.