BouwMat

BIM: Digital integration in the Port of Rotterdam

BIM: Digital integration in the Port of Rotterdam

Economic growth, digitalisation and increased pressure from clients are placing ever greater demands on engineering firms in the hydraulic engineering sector. To anticipate market developments and stay ahead of the competition, it is crucial to offer an efficient and robust design process. Communication across projects is vital to provide an optimal overview of aspects such as costs, planning and management. The Port of Rotterdam, Europe’s largest and most modern port, is developing a central database for the entire port.

The role of engineering firms and an application at an oil terminal in the Europoort

Visualisation of the 3D model, with the quay and combi-wall playing a prominent role.

Building Information Modeling (BIM) offers a solution. This technology is based on managing and controlling data in a single model throughout all design stages, the construction process and the full lifecycle of a structure. Having access at all times to accurate, up-to-date data for a specific time and location ultimately results in improved project delivery and lower costs. At the heart of a BIM-based model is a 3D model, created in a design programme such as Revit. All available information is linked to it, making the impact of this information, and of any changes made, immediately visible.

Oil terminal in the Europoort

For BIM integration in the Port of Rotterdam, Lievense I WSP carried out a pilot for hbr together with De Klerk Werkendam. The project involves the construction of a quay structure and an inland shipping berth, with associated dolphins, for the transhipment of petrochemical products. Consulting and engineering firm Lievense | WSP was responsible for the tender, detailed and construction designs. Lievense I WSP also created the 3D model, compiled the required structural information, gathered relevant data and linked it to the corresponding model objects. The scale at which the Port of Rotterdam applies object standardisation is unique in the Netherlands. The project involves more than four thousand objects, including bollards, foundation piles and anchor rods, to which available information has been linked.

The model is based on the BIM management database of Havenbedrijf Rotterdam, set up by Witteveen+Bos to create a structured system with standardised information transfer for the entire port. Lievense | WSP created a 3D model based on an object tree, alongside the required structural calculations. Geometric information from the model was then stored in spreadsheets for each object type. Non-geometric data from the contractor and client was added to the objects, after which all information was assigned to its corresponding objects in Revit. Finally, the 3D model was exported to the required file format to enable integration with the entire BIM database for the Port of Rotterdam and to generate visualisations.

The project involves the construction of a quay structure and an inland shipping berth for the transhipment of petrochemical products, with associated dolphins.

Digital and integrated collaboration

Centralised information storage for the entire port results in dynamic, well-organised collaboration between the parties involved, reducing the risk of errors. In time, extending this to a so-called ‘Digital Twin’ (virtual representation) of the port and linking it to external factors will open up many possibilities. These include identifying weak links in the port using storm simulations or drawing up a central management and maintenance plan.

Achieving this requires continuous, close collaboration between stakeholders and optimal integration across all project phases. Staff with advanced BIM (management) expertise are also needed to meet the demanding model requirements, along with a powerful server and extensive administrative system. However, standardising information transfer and integrating BIM into current working methods represent such a significant step towards a digital economy that these obstacles are unlikely to halt the development already under way.    

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeDigitalisation from design to construction
  • SubjectBouwMat
  • CompanyWSP
  • CompanyDe Klerk Werkendam
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.