Building in a dynamic environment always brings challenges. Geocon bridges the gap between design and delivery on complex projects and knows better than anyone how to use different monitoring and positioning solutions to keep projects under control. Geocon also has its own distinctive approach to excavation support monitoring and, where necessary, uses the so-called ‘observational method’. Because monitoring goes far beyond the excavation support itself, as the monitoring specialist demonstrates at the new station area in Groningen, among other projects.
Geocon has been a household name in monitoring and positioning solutions for over thirty years. “By excavation support monitoring, we mean checking the design assumptions, managing risks and ensuring safety so that the next construction phase can proceed,” says Carlos Bosma, Geocon’s operations manager. “We are completely independent in our choice of sensors and always look for the best solution in our approach. The measurement technique is not what determines the solution. First, we map the risks and identify what information we need to gather to manage risks or external effects. Only then do we consider how to gather that information, using a camera, sensor, visual inspection or something else.”

Three-way interaction
Gathering data is all well and good, but the loop needs to be closed, Bosma emphasises. “That means drawing up a plan, implementing it, gathering data and then doing something with that data. This is integral to our basic approach. It requires interaction between people, staff and technology. If those three do not work together, it will have no effect. The data gathered must be acted on. We use our monitoring techniques to bridge the gap between the design, delivery and management of, for example, an excavation support structure.”
What information does Geocon gather in and around an excavation support structure? This includes data on the structure itself, such as forces, deformations, inclinometer readings, water levels, water pressure, settlement and deformation. And the surrounding area should not be overlooked: what effect does the construction work and excavation support have on its surroundings? This includes the effects of dewatering on groundwater levels and adjacent buildings, as well as vibration, noise, settlement and building condition surveys. “In Groningen, for example, we are working right in the city centre, with the railway line still in service running over the excavation support structure and the 120-metre-long listed station building just a few metres away.”
Alongside a wide range of sensors and measurement techniques, Geocon also uses new technology. “In recent years, for example, we have increasingly used satellite measurements,” Bosma explains. “These allow us to measure deformation both on adjacent buildings and at street level. We mainly use them to check the effects on the surrounding area.”
Integrated plan that takes account of the surrounding area
What else is happening in and around an excavation support structure? “An important aspect is managing all the interfaces covered by the monitoring plan,” Bosma continues. “This also applies to external influences, such as groundwater abstraction that affects the groundwater table. It therefore also means liaising with the environmental manager, water board and municipality about permits, and ensuring these are incorporated into the plan. Managing the surrounding area is important for successful project control. We assess the effects on the surroundings by drawing up a risk contour plan. We determine the extent of the construction work’s influence in terms of groundwater levels, noise nuisance, vibration, transport movements and so on. Measures can be taken around these risk contours and then checked (monitored) during construction.”
As a specialist in monitoring and positioning solutions, Geocon guarantees an integrated solution, using the best-suited technology for each issue to deliver reliable results for the client.