Underground infrastructure

40,000 tonnes of basalt and slag foundation recycled

“We breken zo’n 40.000 ton basalt en slakkenfundatie.”
“We breken zo’n 40.000 ton basalt en slakkenfundatie.”

Waste materials are generated during the reinforcement of the dike between Gorinchem and Waardenburg. These include concrete, basalt and slag foundation. Kok Lexmond has the important task of processing them so they can be reused.

Working on a dike reinforcement project is nothing new for Kok Lexmond. The company is also involved, for example, in work on the Afsluitdijk. Marco de Rijke of Kok Lexmond says: “But this time it’s in our own ‘backyard’, which makes it special.” The family business Kok Lexmond has been active in civil engineering, recycling and related activities for more than 40 years. “Our work covers a very broad range. We can take care of just about everything needed for a civil engineering project: preparing sites for construction, soil remediation, installing sewers and drainage, mobile crushing, transport, screening, you name it. One of our main activities is recycling construction materials. This is carried out mainly on site. To do this, we have, among other things, twelve mobile crushers, various screens and mobile mixing plants. Waste is processed at our four licensed processing facilities, in Lexmond, Gorinchem, Meppel and Kerkrade. We use specialist equipment to make a wide range of waste materials suitable for reuse. Our waste processing activities consist mainly of crushing stone and concrete rubble and/or asphalt, taking in and sorting construction and demolition waste, accepting and processing soil, and immobilisation. We also specialise in recycling gypsum and autoclaved aerated concrete.”

Soil and rubble are thoroughly screened.

Recycling

Kok Lexmond has been contracted to carry out various works on the Gorinchem-Waardenburg dike section. Marco explains: “We’re supplying around 130 thousand tonnes of mixed aggregate. This is used for the road sub-base, which is then asphalted. We’re crushing 10,000 tonnes of greywacke, screening soil and rubble, and crushing around 40,000 tonnes of basalt and slag foundation. Where possible, we process the waste materials generated, including basalt and slag foundation, into material that can be reused.” Kok Lexmond carries out as much of the processing as possible on site. New technologies and working methods make this possible. “A major advantage is that you can save a great deal on costs, particularly transport, while also limiting CO2 emissions.”

Good collaboration

The experience the company gained previously on the Afsluitdijk comes in handy. “We work with our clients to find solutions, whether that’s around logistics, reusing materials or dealing with situations where something in the project doesn’t go to plan. We put forward options and always look for the best solution for all parties. This project is no different. Our collaboration with the Graaf Reinaldalliantie is very good. Everyone is willing to work things through together, agreements are kept, and the work proceeds in close consultation.”  

Have a business enquiry for Kok Lexmond? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeLower emissions and more reuse
  • SubjectUnderground infrastructure
  • CompanyKok Lexmond
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.