‘We start where the large concrete elements end’

“We specialise in lightweight structures for infrastructure,” says Geert Takke, managing director of Takke-Breukelen. “And we deliver the complete package, precisely in line with the client’s requirements and the visual quality plan. Where the large concrete elements end, we supply and install the finishing components.”
As a supplier of these lightweight structures, Takke-Breukelen is making great strides. Following the acquisition of two sister companies, Delft Infra Composites and LSEngineering, the company now has three divisions. The first specialises in lightweight stainless steel and aluminium structures, complete with features such as glass and lighting. The second is responsible for composite structures. “These include the finishing of civil engineering structures and load-bearing composite structures such as bridges, bridge decks and lock gates.” The third division focuses on the repair and renovation of steel bridges.
The complete product
“As a rule, the main contractors supply the concrete,” says Takke. “We take care of the cladding and finishing. As a partner in the construction process, we are responsible for the design, based on our clients’ 3D models, right through to installing the anchorages. We also carry out our own verification and provide handover documentation. This way of working ensures that all interfaces are perfectly coordinated.”

Preventing clashes
One notable project to which Takke has contributed is the Parallelstructuur A12 in Gouda. A large bridge with a movable section has been built here, complete with edge structures and noise barriers. “Our team checked the swing clearance of our client’s structure and our own,” says Takke. “This eliminated the risk of clashes 100%.”
Complete lift shaft
Takke also had significant responsibility during construction of the Amstelveenlijn. In a single night, it built a lift shaft designed in consultation with the client, complete with glass and lighting, and installed it. By dawn, the lift was ready for use. “That is only possible with perfect preparation, of course,” Takke explains.
Repair and renovation
Finally, the Repair and Renovation division is demonstrating its craftsmanship through the renovation of nine steel bridges across the country, from the Afsluitdijk to the Van Brienenoordbrug. “All the bridges are being strengthened by bonding steel plates. The Friese Scharsterrijnbrug on the A6 and the Suurhoffbrug on the A15 are already ready for the future.”
Sustainability
Takke-Breukelen keeps a close eye on developments across all its activities. Sustainability, and circular construction in particular, is fully integrated into its policies. “For example, we have installed solar panels on a large scale along the N69,” says Takke. “As a result, the entire route is energy-neutral. And in Friesland, we built a cycle bridge using a bio-based composite. We are proud of that. When it comes to sustainability, we like to look beyond conventional solutions.”