Foundations / Site investigation
A tried-and-tested name for almost a century

Piling has been used for centuries in the Netherlands to provide buildings and civil engineering structures with a stable foundation. Installing precast concrete piles and steel tubular piles is a specialist skill that calls for craftsmanship. Hei- en Waterwerken H. van Dieren has been honing that craft for more than ninety (!) years. The family business contributes to a wide range of projects and is also well equipped to work in locations with limited space.
Hei- en Waterwerken H. van Dieren is a close-knit family business, now led by its third generation. “Piling is our core business. Over the years, we have grown into a trusted partner in the foundation industry. Whether it involves installing many thousands of piles with several machines working at the same time, or piling in a confined space with, for example, a height restriction, we are ready for any challenge. Our great strength lies in the flexibility we offer. We are always there for our customers and guarantee a high-quality end result.”
A wide range of piling rigs
Hei- en Waterwerken H. van Dieren has an extensive fleet of machinery. “For traditional piling work, we have piling rigs equipped with hammers ranging from 3 to 9 tonnes, which we transport on our own low-loaders. This means we are not dependent on third parties and are fully self-sufficient. Where it is not possible or desirable to bring in a heavy machine, we can use one of our mini piling rigs. Our wide-ranging fleet means we can provide a solution for almost any piling challenge. We also have a pile breaker for cropping concrete piles after installation. This work must be carried out carefully so that the pile reinforcement can form a solid connection with the foundation reinforcement.”

A green future
In more than ninety years, Hei- en Waterwerken H. van Dieren has built up an impressive portfolio. One fine example is a piled foundation comprising more than 10,000 concrete piles for a large solar farm that supplies almost 16,000 households with electricity. The pile heads were required to be no more than 5 centimetres out of alignment, even though the piles protrude 4 metres above ground level. That is craftsmanship, and it is essential for a project around the Ring van Groningen. Over several years, Hei- en Waterwerken H. van Dieren is working in phases on the foundations for various gantries, using piles ranging from 32/32 to 40/40. Almost all the work takes place in the evening and at night, during road closures. “As a family business, we can respond flexibly to this too.”
Whether it is piling foundations with thousands of piles for major infrastructure projects and huge commercial buildings, or a small project requiring just a few piles, Hei- en Waterwerken H. van Dieren is the right choice. And you can count on the highest quality.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeSafe working and skilled professionals
- SubjectFoundations / Site investigation
















