Global tunnel expertise tailored to Dutch infrastructure
Text Roel van Gils Image Doka

Doka supplies formwork, shoring structures and scaffolding worldwide for almost every concrete project. As part of the international Doka organisation, headquartered in Austria, its Dutch subsidiary can draw on a wealth of knowledge and experience from projects around the world. This international expertise is particularly valuable on complex infrastructure projects.
Doka is known as a one-stop supplier of formwork and shoring systems. “We provide solutions for housing, commercial construction and major infrastructure projects,” says Remco de Jong. “It is not just about the technology, but also about safety, logistics and buildability on site. For complex projects, we draw on the expertise of our Global Expertise Centers (GECs). These centres bring together experts who work on challenging projects around the world every day, ranging from bridges and tunnels to heavy-duty shoring structures.”

Comparable projects
The strength of a global organisation lies in being able to learn from hundreds of comparable projects, Remco explains. “When we receive an enquiry for a complex tunnel project, our specialists pool experience from different countries and translate it into a solution suited to local conditions.”
That is necessary, because no two tunnels are the same. “A tunnel beneath a river has different requirements from one in a mountainous area,” he says. “Length, shape, loads and construction methods also vary from project to project.”
UniKit system
That is why Doka developed the UniKit system: a modular system of heavy-duty steel components that can be combined in a variety of ways. “In the past, heavy steel structures were often welded for each project, but standardised approaches are now increasingly being adopted,” Remco explains. “The steel components are bolted together rather than welded. This eliminates many time-consuming checks, certifications and weld inspections, while retaining flexibility. The same building blocks can be used to assemble straight, curved or complex tunnel formwork.”
Julianaplein Groningen
The tunnel project at Julianaplein in Groningen, part of Aanpak Ring Zuid, is a good example. “Two intersecting tunnels had to be built here. The challenge lay in the complex geometry: sloping floors, curved tunnel alignments and varying heights,” says Remco. “We designed a travelling formwork unit that could be used for both tunnels. The structure was fully adapted to the tunnels’ sloping shape and mounted on wheels, so it could easily be moved to the next tunnel section after each construction phase.”

Cut-and-cover tunnel at De Groene Boog
Flexibility was also important during construction of the cut-and-cover tunnel at De Groene Boog in Rotterdam, Remco says. “The project budget was under pressure, while construction logistics still had to run efficiently. We developed a solution using tunnel formwork units that could be winched to the next tunnel section. By using existing system components, we delivered a cost-effective solution without compromising on safety or quality.”
The combination of standardisation and customisation lies at the heart of Doka’s philosophy, Remco concludes. “We aim to enable as many applications as possible with as few different components as possible. That makes stock management more efficient, allows rapid deployment and delivers reliable solutions. In addition, every project is supported by specialist engineers and instructors who guide the contractor through assembly and site safety.” Global expertise translated into local solutions makes it possible to deliver even the most challenging tunnel projects safely and with confidence.
Have a business enquiry for Doka Nederland B.V.? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeUnderground construction
- SubjectNews
- CompanyDoka Nederland B.V.