Bridge construction

More than 30 years of collaboration in tunnel engineering

Guido Lahaije, Tunnel Engineering Consultants.
Guido Lahaije, Tunnel Engineering Consultants.

Tunnels hold no secrets for Robin Gerrets (Witteveen+Bos) and Guido Lahaije (Royal HaskoningDHV). The companies they work for are part of a partnership called Tunnel Engineering Consultants (TEC), which has been going strong for more than 30 years. The municipality of Amsterdam uses TEC’s services for engineering and design work under the Amsterdam Road Tunnel Programme (AWA). We talk to Robin and Guido about the unique ‘Amsterdam standard’, which delivers a distinctive approach while remaining fully within the framework of tunnel legislation.

Expertise and skills with wide-ranging applications

“Our parent companies complement each other’s expertise within TEC,” Guido begins. “TEC’s expertise originally centred on immersed tunnels, but has since become so broad that we are now sought out for tunnel projects around the world.” Robin adds: “We provide every kind of engineering service related to tunnels. Under the AWA programme, all the installations are being replaced, and we are also dealing with related matters such as traffic safety, flora and fauna surveys, geotechnical engineering and all the structural work involved. We check whether the tunnels still comply with current legislation and whether the original calculations are still valid, for example in relation to water ingress. Every tunnel leaks to some extent by nature, but is it still within today’s requirements? We want to have such matters documented.”

Robin Gerrets, Tunnel Engineering Consultants.

AWA is also ‘typically Amsterdam’

Robin explains how the different strands of work under the AWA programme fit together: “40% of the work concerns tunnel installations, everything involving a wire; 20% is about how the installations operate; 20% involves setting up BIM records, along with associated elements such as 3D visualisation and simulation; and 20% falls into the ‘other activities’ category. This breakdown is ‘typically Amsterdam’ and stems from the municipality’s aim for AWA to produce a blueprint that can be applied to all Amsterdam’s tunnels. Work on the blueprint ran in parallel with the work on the Piet Heintunnel. We are now applying it for the first time, drawing on what we learned from the Piet Heintunnel, and refining it further at the ArenaTunnel.”

Guido says they are working on a standard for control, management and maintenance. “That is also why we are involved in designing the new traffic control centre, from which all Amsterdam’s tunnels will be controlled. That is right up TEC’s street: it allows us to bring all our expertise to bear.” Robin poses the rhetorical question of why Amsterdam wants its own standard: “We do look at what Rijkswaterstaat has devised and prescribed. However, a tunnel in an urban area is not a like-for-like copy of a motorway tunnel. Many other factors come into play, including different traffic behaviour. We take everything into account in the Amsterdam standard, fully comply with national tunnel legislation and safeguard this local standard through close collaboration across AWA.”

Guidance on the digital process, too

The benefit to the municipality of Amsterdam from working with TEC is that it needs only one point of contact for all its tunnels. “The benefit for us is that our staff can move from one tunnel to another,” Robin explains. “After working this way for 2 years, we can confidently say it has been a success. We have a good understanding of each other’s interests.” TEC also provides guidance on the digital side of the design process, including BIM, 3D visualisations and the delivery of digital twins: virtual tunnels used for design, testing, monitoring and training. “Investing up front leads to a better end product, prevents rework costs and makes data more reliable and accessible,” says Guido.

To conclude, the two men say they take their hats off to the municipality of Amsterdam’s open, transparent and innovative approach. “It also creates room for us to challenge each other with critical questions, which always leads to useful discussions,” Guido concludes.     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeUnderground construction
  • SubjectBridge construction
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.