No GWW bridge special would be complete without an article from Gigant Temporary Infrastructures, even if the company is something of an odd one out in the bridge construction sector. As the name suggests, Gigant Temporary Infrastructures specialises in supplying and building temporary bridge structures. “Our solutions enable members of the public and construction workers to get where they need to go, safely and responsibly,” says Raymond van Noort of Gigant International BV.

Gigant has its roots in stage and event structures. When the pandemic caused our projects in the events sector to drop from 600 to almost zero in 2020, we stepped up our focus on infrastructure and construction projects. Our modular systems are ideally suited to this work. We are one of the largest platform suppliers in the Benelux and have almost 40 years’ experience in designing, engineering and building professional temporary infrastructure for the public sector.”
Quick, safe and capable of spanning large distances
Using the highly reliable Layher-Allround system and products developed in-house and certified by TÜV, Gigant can rapidly deliver temporary safe infrastructure such as stairways, pedestrian and cycle bridges, ramps and public-access floor structures such as platforms. “Our large stock enables us to respond and deliver quickly. The modular system allows for swift assembly and can be installed anywhere without the need for earthworks. It can achieve large spans: for a bridge open to the general public, we can provide a clear span of up to 22 metres. For a bridge used only by briefed users, such as construction workers on a building site, the floor loading requirements are lower, allowing us to provide a clear span of up to 33 metres. Naturally, we ensure that every structure meets all requirements and specifications. This makes our solutions ideal for construction sites, local authorities and events.”

Sustainable and circular
Gigant’s temporary bridges, built mainly from steel and timber, have a long service life, and all their components can be reused time and again. “We deliver all our materials to the site as one large construction kit. Despite taking up very little space in transit, we can build something enormous. Once on site, we assemble the structure and generate virtually no waste. That makes it highly circular and sustainable,” says Van Noort, who goes on to name some of the projects delivered by Gigant.

Temporary infrastructure
“On the Mol-Hasselt railway line (B), near Beringen railway station, a temporary bridge was built over a double-track railway. It stands 6 metres high and has a clear span of 22 metres. The challenges were access to the site, as all the materials had to be brought in by crane, and the safety requirements. After all, we had to contend with the railway’s overhead line and the wind suction caused by passing trains. We know what is expected of us and always provide a suitable solution.” The stair towers have child-friendly handrails, and for safety reasons the section above the railway is enclosed with sheet material up to a height of 1.5 metres. Gigant also prepared the technical reports for the local authority and stakeholders. “Another major project is the unusual temporary pedestrian bridge over the huge, 15-metre-deep excavation for the new RTBF building in Brussels. The temporary bridge serves as an escape route for the neighbouring care home. It is more than 2 metres wide and has a clear span of almost 27 metres, with a minimal bearing area. We normally use large support columns, but here the bridge could rest on a concrete ring beam just 80 cm wide on one side of the excavation,” says Van Noort, emphasising that the entire structure was built in just two days. “As you can see, whether it’s a 2-metre bridge over a ditch or a mega-structure, we always find a solution and make inaccessible places accessible.”

Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeExtending the life of roads and civil engineering structures
- SubjectBridge construction