Zwijndrecht continues to reuse lava road sub-base

The municipality of Zwijndrecht manages and maintains approximately 2,500,000 m² of paved surfaces. Around 650,000 m² consists of asphalt. Lava was used in the past as a road sub-base beneath many asphalt roads. A number of roads with lava sub-bases required extensive maintenance.
When drawing up preliminary cost estimates for the maintenance projects, Zwijndrecht discovered that the conventional method would require large quantities of lava to be excavated, transported away and disposed of. Poor access to neighbouring residential areas and business parks was another undesirable consequence. Falling weight deflectometer tests were carried out on Ringdijk, Molenweg and Lindtsedijk. The average stiffness measured in the lava sub-base was just 45 MPa. This was too low for the lava to be reused directly as road sub-base material.
Investigating reuse
Zwijndrecht needed advice on how best to deal with the existing road sub-bases and had to look for alternative construction methods. One option was to investigate reusing the existing lava. A number of studies were carried out to assess whether this was feasible. These included:
- Assessing the stiffness of existing road sub-bases using falling weight deflectometer tests;
- Preparing and testing samples in a laboratory;
- Selecting a trial section.
Trials
Wegbouwkundig Advies Bureau Van den Boom BV, now Lavaplus BV, proposed a possible solution: reuse the lava in situ by mixing it with cement. In 2007, the consultancy commissioned laboratory trials in which lava was mixed with cement. The average stiffness measured was 3,500 MPa. These values were presented to the water authority responsible for the flood defences on which the municipal roads are located, Waterschap Hollandse Delta (WSHD). WSHD considered an average stiffness of around 3,500 MPa far too high for a (stiff) foundation layer in a road pavement on a dike. A dike is always moving, which could cause significant cracking in the foundation and road pavement.
The consultant suggested mixing the lava with foamed bitumen and cement.
This makes the foundation layer more flexible than if it were mixed with cement alone. The team looked for examples of previous projects. Research online and in various trade journals showed that lava mixed with cement and/or foamed bitumen had not been used anywhere before.
The next step was to test the idea in a laboratory. Test specimens were prepared and initially tested for their Marshall value. The results were promising. The specimens were then used to determine stiffness, and this test was also successful. The stiffness measured was 750 MPa, higher than the values for common foundation materials such as mixed aggregate (400 MPa) and hydraulically bound mixed aggregate (600 MPa).
Trial section
Following the positive laboratory results, Zwijndrecht selected a 150-metre trial section on a dike embankment (Ringdijk) in 2011. The municipality and the consultancy tested the laboratory results in practice. The trial section is monitored annually. The road structure still meets the requirements set by the municipality in 2011.
Projects completed using upgraded lava sub-base
Building on the experience gained from the trial section, it was decided to carry out the Herinrichting Ringdijk project (1.3 km) in 2013. Here too, the existing lava sub-base was mixed with foamed bitumen and cement. The same method was then used on Molenweg in Heerjansdam (0.4 km) in 2014 and Lindtsedijk (3.5 km) in 2018.
In summary, the following conclusions can be drawn:
- Circular reuse of the lava sub-bases meant that very little material needed to be transported to or from the sites;
- CO2 emissions were significantly lower;
- Construction times were shorter;
- Disruption for residents and businesses was significantly reduced;
- Around € 1 million, including preparation, administration and supervision costs, was saved across the three projects compared with conventional construction methods;
- The road pavement is expected to have a longer service life thanks to the good stiffness of the new road sub-base.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeLower emissions and more reuse
- SubjectBouwMat