BouwMat

Zwijndrecht continues to reuse lava road foundations

Zwijndrecht continues to reuse lava road foundations

The municipality of Zwijndrecht manages and maintains around 2,500,000 m² of paved surfaces. Approximately 650,000 m² is asphalt. Lava was used as a road foundation material beneath many asphalt roads in the past. Several roads with lava foundations required major maintenance. 

When preparing preliminary cost estimates for the maintenance projects, Zwijndrecht discovered that the conventional method would require large quantities of lava to be excavated, transported away and sent to landfill. Poor access to neighbouring residential areas and business parks was another undesirable consequence. Falling weight deflectometer tests were carried out on Ringdijk, Molenweg and Lindtsedijk. The average measured stiffness of the lava road foundation was just 45 MPa. This was too low for the lava to be reused directly as road foundation material.

Research into reuse
Zwijndrecht needed expert advice on how best to deal with the existing road foundations and had to look for alternative construction methods. One possible solution was to investigate reusing the existing lava. A number of studies were carried out to assess whether this was feasible. These included:

  • Measuring the stiffness of existing road foundations using falling weight deflectometer tests;
  • Preparing and testing samples in a laboratory;
  • Selecting a trial section. 

Trials
Wegbouwkundig Advies Bureau Van den Boom BV, now Lavaplus BV, proposed a potential solution: reuse the lava in situ by mixing it with cement. In 2007, the consultancy had laboratory trials carried out in which lava was mixed with cement. The average stiffness values measured were 3,500 MPa. These values were submitted to the water board responsible for the flood defences (WSHD), on which the municipal roads are located. WSHD considered an average stiffness of around 3,500 MPa far too high for a (stiff) foundation layer in a road on a dike. Dikes are always moving, which could cause significant cracking in the foundation and road pavement. 

The consultant suggested mixing the lava with foamed bitumen and cement. 

This makes the foundation layer more flexible than if it were mixed with cement alone. The team looked for examples of similar work carried out previously. Online research and a review of various trade journals showed that lava mixed with cement and/or foamed bitumen had not been used anywhere before. 

The next step was to test the idea in a laboratory. Trial specimens were prepared and initially tested for their Marshall value. The results were promising. The specimens were then used to determine stiffness, and this test was also successful. The resulting stiffness value was 750 MPa, higher than the values for commonly used foundation materials such as mixed granulate (400 MPa) and hydraulically bound mixed granulate (600 MPa).  

Trial section
Following the positive laboratory results, Zwijndrecht selected a 150-metre trial section on the Ringdijk embankment in 2011. The municipality and the consultancy tested the laboratory results in practice. The trial section is monitored annually. The road construction still meets the requirements set by the municipality in 2011.  

Projects using upgraded lava foundations
Drawing on the experience gained from the trial section, the decision was made to carry out the Herinrichting Ringdijk project (1.3 km) in 2013. Here too, the existing lava foundation was mixed with foamed bitumen and cement. The same method was then used on Molenweg in Heerjansdam (0.4 km) in 2014 and on Lindtsedijk (3.5 km) in 2018. 

In summary, the following conclusions can be drawn:

  • The (circular) reuse of the lava foundations meant that there was virtually no need to transport materials, such as soil, to or from the site;
  • CO2 emissions were significantly lower;
  • Construction times were shorter;
  • Disruption for residents and businesses was significantly reduced;
  • Around €1 million (including VAT and consultancy costs) was saved on the construction costs of the three projects compared with conventional construction methods;
  • The road pavement is expected to have a longer service life, thanks to the good stiffness of the new road foundation.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeLower emissions and more reuse