The municipality of Zwijndrecht manages and maintains approximately 2,500,000 m² of paved surfaces. Around 650,000 m² is asphalt. In the past, lava was used as a road base beneath many asphalt roads. A number of roads with lava road bases required substantial maintenance. 

When preparing preliminary cost estimates for the maintenance projects, Zwijndrecht found that the conventional method would require large quantities of lava to be excavated, removed and sent to landfill. Poor access to neighbouring residential areas and business parks was another undesirable consequence. Falling weight deflectometer measurements were carried out on Ringdijk, Molenweg and Lindtsedijk. The average stiffness measured in the lava road base was just 45 MPa. This was too low for the lava to be reused directly as road base.

Investigating reuse
Zwijndrecht needed expert advice on the best way to deal with the existing road bases and had to look for alternative construction methods. One possible solution was to investigate reusing the existing lava. Various studies were carried out to assess whether this was feasible. These included:

  • Measuring the stiffness of existing road bases using falling weight deflectometer measurements;
  • Preparing and testing trial samples in a laboratory;
  • Selecting a trial section. 

Trials
Wegbouwkundig Advies Bureau Van den Boom BV, now Lavaplus BV, proposed a possible solution: reusing the lava in situ by mixing it with cement. In 2007, the consultancy commissioned laboratory trials in which lava was mixed with cement. The stiffness values measured averaged 3,500 MPa. These figures were submitted to the water authority responsible for the flood defences (WSHD), on which the municipal roads are located. The WSHD considered an average stiffness of approximately 3,500 MPa far too high for a (stiff) base layer in a road pavement on a dike. Dikes are always moving, which could cause significant cracking in the base and road pavement. 

The adviser suggested mixing the lava with foamed bitumen and cement. 

This makes the base layer more flexible than if it were mixed with cement alone. The team looked for examples of previous projects. Research online and in various trade journals showed that lava had never been mixed with cement and/or foamed bitumen. 

The next step was to test the idea in a laboratory. Trial specimens were produced and initially tested for their Marshall value. The results were promising. The specimens were then used to determine stiffness. This test was also successful, yielding a stiffness value of 750 MPa. This was even higher than the values for commonly used base materials such as mixed aggregate (400 MPa) and hydraulically bound mixed aggregate (600 MPa).  

Trial section
Following the positive laboratory results, Zwijndrecht selected a 150-metre trial section on a dike embankment (Ringdijk) in 2011. The municipality and the consultancy tested the laboratory results in practice. The trial section is monitored annually. The road structure still meets the requirements set by the municipality in 2011.  

Projects using upgraded lava base
Building on the experience gained from the trial section, it was decided to carry out the Herinrichting Ringdijk project (1.3 km) in 2013. Here too, the existing lava base was mixed with foamed bitumen and cement. The same approach was used on Molenweg in Heerjansdam (0.4 km) in 2014 and on Lindtsedijk (3.5 km) in 2018. 

In summary, the following conclusions can be drawn:

  • The (circular) reuse of the lava bases meant that hardly any materials or soil had to be transported to or from the sites;
  • CO2 emissions were significantly lower;
  • Construction times were shorter;
  • Disruption to residents and businesses was significantly reduced;
  • Approximately € 1 million (including preparation, administration and supervision costs) was saved on the construction costs of the three projects compared with conventional construction methods;
  • The road pavement is expected to have a longer service life, thanks to the good stiffness of the new road base.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeLower emissions and more reuse