BouwMat

Water board aims to cut CO2 emissions by 95% during Lauwersmeerdijk-Vierhuizergat dike reinforcement

Water board aims to cut CO2 emissions by 95% during Lauwersmeerdijk-Vierhuizergat dike reinforcement

Waterschap Noorderzijlvest will start work on the Lauwersmeer-Vierhuizergat dike reinforcement in 2023. By using electric machinery, the water board aims to reduce CO2 emissions by 95%. It plans to invest €8.2 million in the project. Together with GMB and Heijmans, working as the Waddenkwartier contractor consortium, it has asked regional businesses to invest in cleaner, lower-emission machinery too. This is an important incentive for making equipment more sustainable in the civil engineering sector.

Eisse Luitjens, executive board member of Waterschap Noorderzijlvest: “With this investment, we are making an important contribution to the ambition shared by the water board and the national government to cut greenhouse gas emissions by 49% by 2030, compared with 1990. We are also showing that we are investing heavily in the energy transition in Groningen. I am delighted that we, as a water board, can contribute to this. We also need the Flood Protection Programme (HWBP) to make the investment. The HWBP supports our ambition, and we are in constructive discussions about the funding.”

Gérard Porton, project manager, on behalf of the Waddenkwartier contractor consortium of Heijmans and GMB: “Both Heijmans and GMB aim to build entirely emissions-free from 2026. This is an important step in the right direction. By using zero-emission equipment, we are working together to achieve a substantial reduction in CO2 emissions during the dike reinforcement. Thanks to the efforts of Heijmans, GMB and regional businesses, we are moving more quickly towards a sustainable, emissions-free construction site. We are extremely proud of that.”

Electricity- and hydrogen-powered lorries, cranes, trailers and generators

The equipment to be used includes a hydrogen-powered lorry, various large and small cranes, tipper lorries, tractors with trailers and generators. This electric equipment will save around 600,000 litres of diesel, a 22% reduction in total diesel consumption. The diesel we use is fossil-free and renewable, known as Hydrotreated Vegetable Oil (HVO100) diesel. The use of electric equipment and HVO100 diesel together will cut CO2 emissions by 95% compared with using conventional equipment to reinforce the dike.

Reusing materials and enhancing biodiversity

As well as reducing emissions, we are reinforcing the dike by reusing materials and contributing to biodiversity. The project includes various measures to benefit nature, such as fish migration and a freshwater-saltwater transition zone. It also includes artificial reefs in front of the dike, forming a natural transition, and the development of a natural salt marsh. Part of the dike will be sown with grass rich in flowers and herbs. The dike has also been designed according to circular principles. This means that almost 100% of the asphalt, clay and copper slag blocks from the existing dike will be reused in the new one, greatly reducing the need to bring in new raw materials.

About the Lauwersmeerdijk-Vierhuizergat dike reinforcement

From 2023, the water board and its partners will reinforce the Lauwersmeerdijk in Groningen. The project covers 9 kilometres of sea dike between Lauwersoog and the Westpolder. Alongside the reinforcement work, we will also deliver additional benefits for nature, recreation and transport. This will ensure that we remain well protected against flooding in the future, while also enhancing nature, recreation and accessibility in the area.
Find out more at lauwersmeerdijk.noorderzijlvest.nl

About the Flood Protection Programme

This dike reinforcement is part of the Flood Protection Programme. Through the HWBP, the 21 water boards and Rijkswaterstaat are working together on the largest dike reinforcement programme since the Delta Works. Over the next 30 years, at least 1,500 kilometres of dikes, as well as 500 locks and pumping stations, will be reinforced. This is how we are helping to create a country where people can live, work and enjoy their leisure time in safety. Find out more at www.hwbp.nl.

A business enquiry for GMB? Get in touch

Who worked on Lauwersmeerdijk-Vierhuizergat

  1. contractorGMBIn this story
  2. contractorHeijmansIn this story
  3. the groundworkCombinationMentioned in Making the most of every job
  4. water boardwaterschap NoorderzijlvestMentioned in Hinged ‘green’ concrete mat

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectLauwersmeerdijk-Vierhuizergat
  • ThemeFlood protection and climate-resilient water management
  • SubjectBouwMat
  • CompanyGMB
  • CompanyHeijmans
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.