BouwMat

So far, the machine works faster for me

So far, the machine works faster for me

We visit machine operator Thijs van Grunsven, who has been working for Gebr. Van den Brand en van Oort B.V. (GBO) in Uden for three years. Thijs is one of the operators in the ‘De Bouwplaats van Morgen’ consortium, in which GBO and seven other companies invested in a DX165W Electric wheeled excavator.

GBO is a reliable partner in earthmoving, and is also active in demolition, rubble recycling, sand extraction and transport. This versatile family business places great value on quality, reliability, craftsmanship and flexibility. To ensure it is always ready to take on any challenge, GBO has a well-maintained fleet of machinery, including various Doosan excavators.

Experience

Thijs has been busy operating his electric excavator in recent weeks. We wanted to hear all about his first impressions and what it is like to make the switch to electric. “So far, the machine works faster than the other Doosan I’ve operated, which I see as a positive. We even tested it. We also have a Doosan DX170W-5 wheeled excavator at our depot, and this machine really does work faster than that one. It was cool to experience. One thing I still have to deal with as an operator is that the necessary charging infrastructure is not always properly and safely set up at the places where I have to work. So it’s not really a major challenge for the machine, because it does its job, but rather for the facilities around it,” says Thijs. When we ask him how he felt about operating the electric machine, Thijs quickly turns the question around. “I didn’t have to. They asked me if I wanted to give it a try, and I thought it would be great to do that. I’m still quite young, so I think it was easy for me to make the switch now.”

The project

Thijs is currently working on a site where an old asphalt plant has been removed. The site now needs to be prepared for the construction of a new distribution centre. They have encountered a few challenges on the project, one of which is that the building work is taking place on peat soil, which is softer, but this has no further effect on the machine. It works long days, so Thijs sometimes has to change its Powerbox, but that is no problem at all, he says. “Changing the Powerboxes is really quick. I can do it in under 6 minutes. At the end of the day, I simply plug the machine into the mains and go home. When I return to work the next day, the machine is fully charged. Refuelling with diesel takes a bit longer.”

De Bouwplaats van Morgen

Some time ago, we announced that GBO was taking part in ‘Bouwplaats van Morgen.’ Together with seven other companies, it is putting electric machinery to work and testing how it performs. The research findings will be shared with TNO, and, alongside informing the Netherlands Enterprise Agency (RVO), the partners can also tell the sector what is involved. This will help the sector learn from these case studies and, hopefully, make it easier and quicker for it to take the step towards zero emissions. “We’re keeping a close eye on developments. As we usually work as a subcontractor, an electric machine does not give us an advantage when tendering. The electric machine is being used extensively in collaboration with our partner BAM Infra,” says co-owner Wilko van Oort.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeConstruction equipment and transport in motion
  • SubjectBouwMat
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.