BouwMat

RWS validates motorway maintenance measure

RWS validates motorway maintenance measure

After eight years of research, Esha PenTack, made by Esha Infra Solutions, has been found to meet Rijkswaterstaat’s requirements as a life-extending maintenance treatment for ZOAB. With validation by RWS, PenTack is the first life-extending maintenance measure approved for large-scale motorway maintenance. 

Applying PenTack extends the life of asphalt (ZOAB, as well as DGD and SMA) by several years, without affecting skid resistance, noise reduction or water permeability. A PenTack treatment can be repeated on ZOAB up to three times, potentially extending its life by as much as nine years. This makes a substantial contribution to reducing CO2 emissions. What is more, using PenTack causes far less disruption to road users than laying a new asphalt surface, as the road can be reopened soon after maintenance.

Since 1996
Back in the 1990s, Esha Infra Solutions developed PenTack, a bitumen emulsion containing a rejuvenating component. The treatment restores sufficient flexibility to the binder in aged asphalt, thereby preventing ravelling for many years. The bitumen emulsion is applied to the aged asphalt pavement using computer-controlled spray trucks, then covered with aggregate to ensure adequate skid resistance.  

A business enquiry for ESHA Infra Solutions? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeExtending the life of roads and civil engineering structures
  • SubjectBouwMat
  • CompanyESHA Infra Solutions
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.