BouwMat

J. Veldhuizen is committed to a sustainable future

J. Veldhuizen is committed to a sustainable future

We visit J. Veldhuizen B.V. in Westbroek, in the municipality of De Bilt. Last weekend, operator Stijn put the prototype Doosan DX165W Electric mobile excavator through its paces.

We also speak to Jaap Veldhuizen, the company’s owner, about the future of sustainability and what it means to him. 

History

“My grandfather was a farmer, and my father started an agricultural contracting business in 1956. He ran it successfully and, around 1970, also moved into earthmoving for major contractors such as Mourik and KWS. I joined my father’s business when I was 18. In 1994, we formed a partnership, and in 1999 I became the owner. It was a logical step for me: by then, my father was 68 and was retiring. My son Jordi now works in the business too, and in time he will take it over from me. It’s good to keep it in the family,” says Jaap.

Er is een nieuwe richtlijn opgesteld voor het uitvoeren van funderingswerkzaamheden in een publieke omgeving.

Sustainability

For Jaap, sustainability represents a new vision, one he wants to pursue at the forefront alongside Jordi. “We’re willing to take on the challenge of making our business more sustainable. It’s a big undertaking, and we’re very aware of that. It calls for significant investment and the courage to take a leap into the unknown together with our partners. But we believe this is the path we need to take. We’ve already taken the first steps. A van, a shovel, a tyre saw, a rammer and a vibrating plate are already electric, so we can carry out our streetworks entirely electrically. We’re also working on covering all the roofs of our business premises with solar panels, so we can charge all our equipment using green electricity. The only thing we’re still missing is an electric excavator. Then we’ll be able to offer the complete package.”

Raising awareness

“We currently have one project where we deploy our electric equipment. That’s not enough to recoup the investment, but it should help raise awareness among municipalities and government bodies. And not just among public authorities, but major contractors too. We can see the laws and regulations imposed by the ministry changing, but the really big steps still aren’t being taken on site. Projects are tendered as sustainable, yet carried out using diesel because it is simply cheaper and you don’t get the hourly rate needed for zero-emission work. That does bother me, because you’re putting your neck on the line to make your fleet zero-emission. Municipalities need to enforce the rules and build up their expertise, so that everyone delivers on what they promise when bidding for a project.”

Putting it through its paces

Over the past few weekends, operator Stijn has been working with the Doosan DX165W Electric mobile excavator prototype. “I normally operate another make of excavator, which I’m perfectly happy with, but when Jaap said that zero emissions were the future for the business, I wanted to give the Doosan DX165W Electric a chance. I have to say, it’s exceeded my expectations! Electric isn’t something I would personally choose straight away, but it really does work well. There are still a few things that could be improved here and there, but it is a prototype, after all. One thing I think could be improved, for example, is the noise in the cab. If they insulated the pump, which is making noise at the moment, a bit better, it would make the excavator almost silent. We also need to think carefully about charging as a company, to make sure it works from a logistical point of view, and that I can easily charge it at the depot at the end of the day. But my first experience with electric machinery has been very positive. I’m looking forward to seeing more,” says Stijn.

DKTI

It will take some time, but Jaap hopes to add an electric mobile excavator to the fleet by the end of this year. “Together with other parties, we have submitted a proposal for the purchase of a Doosan DX165W Electric as part of a consortium under the DKTI subsidy scheme run by Netherlands Enterprise Agency (RVO). If we receive this subsidy, the machine will be further developed as part of the DKTI project.”

“This is our first step towards working in a CO2-neutral way, particularly in urban areas. The Doosan Infracore DX165W Electric is still under development. We spent several weekends logging the first hours of field testing the prototype on a KWS project. The tests were positive, though some optimisation will still be needed before the machine can go into production.”

A business enquiry for Veldhuizen b.v.? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeConstruction equipment and transport in motion
  • SubjectBouwMat
  • CompanyVeldhuizen b.v.
  • CompanyMourik
  • CompanyKWS
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.