Underground infrastructure

Major sewer system repairs in Tilburg-Noord

Text Chris Elbers Beeld Heijmans/Vanderkamp - The Dutch Water Engineers/fotovitalis

Overview van de tijdelijke pompinstallatie (noordzijde) (Beeld: ©Vanderkamp – The Dutch Water Engineers).
Overview van de tijdelijke pompinstallatie (noordzijde) (Beeld: ©Vanderkamp – The Dutch Water Engineers).

Sometimes reality is very different from what first impressions suggest. That proved to be the case again last January, when Rions Riooltechniek discovered minor ground subsidence near a sewer manhole on IJpelareweg in Tilburg-Noord. A thorough analysis revealed that the problem was much bigger than the sinkhole alone. Four sewer pipes that carry wastewater from almost all of Tilburg to the treatment plant had also probably subsided and cracked as a result of heavy rainfall and a high groundwater level. This was an emergency that called for a fast, professional solution. To achieve that, Heijmans and Vanderkamp, The Dutch Water Engineers from Zwolle are joining forces.

Once Rions had made its findings, the company immediately contacted a number of external parties at the suggestion of Gemeente Tilburg. One of them was Heijmans, which was asked both to provide advice and to devise a practical solution to the emergency. “Together with Gemeente Tilburg, Rions and various consultants, we first analysed the situation in detail,” says Wouter van Leeuwen, project manager for Heijmans. “We soon discovered that several manholes on site had subsided and were damaged, allowing both groundwater and sand to flow into the sewer. But that was not all. The subsidence had also damaged a sewer pipe approximately 2 metres in diameter. This led to more sinkholes. What initially looked like relatively minor ground subsidence turned out to be a much larger problem, on a corresponding scale. Rapid intervention was essential.” 

Wouter van Leeuwen (project manager) and Borus Ploegmakers (project controller).

Challenges 

Heijmans quickly moved on to find a suitable solution. The task was clear, as were the enormous challenges it faced. “The sewer pipe, which normally carries around 15,000 cubic metres of wastewater per hour on site together with three similar pipes, lies 6 metres underground in the groundwater,” says Wouter, explaining the biggest challenge. “Replacing it is a major undertaking, not least because a gas pipeline also needs to be diverted. In March 2024, we presented a design to replace the subsided manholes and sewer pipe. In the meantime, however, groundwater levels remained very high and further subsidence occurred.”   

In the end, the other three sewer pipes at the problem site were also found to be damaged and subsided. This meant Heijmans had to act quickly. In September, this culminated in a 17 by 42 metre cofferdam. Moving the water from upstream of the problem site to downstream required a pump with a very high capacity. Only a handful of companies in the Netherlands can supply such a system. Heijmans eventually turned to Vanderkamp, a leading supplier of temporary pumping solutions. “We then worked with the water authority and Gemeente Tilburg to assess the required capacities and the flow rates we needed to allow for,” Wouter continues. “Vanderkamp translated all this into a design for a huge system comprising five pump sets, which was installed in June before the sewer pipes were shut off. This pumping system, with a capacity of no less than 14,500 cubic metres per hour, will remain in place until we have completed the work. The first step, starting in January 2025, is to replace the sewer. The project is expected to be completed in May 2025.”

Rions Riooltechniek staff installing plate valves.

Construction

Until then, the pumping system supplied by Vanderkamp will run 24/7. Sales engineer Marco Wesseling and project manager Michiel Sieders are closely involved in the work in Tilburg on behalf of the Zwolle-based company. “When Heijmans told us that the project required a pumping system with a very high
 capacity, we first worked with Gemeente Tilburg, Heijmans and the water authority to determine the best location for the system,” says Marco. “We then developed several designs together and visited the site to work out the route for the entire line of pump sets. Those findings were incorporated into a 3D design. We also carried out various calculations for the electrical and hydraulic systems. Once the pumping plan was finalised, we started building the system.”

Overview of the emergency site.

Capacity

As Michiel explains, the challenges had several dimensions and aspects. In addition to managing the project day to day for Vanderkamp, he was also responsible for translating the pump design into practice. “First, there is the capacity the system needs to deliver. In the sewer sector, the terms dry-weather flow and wet-weather flow are used, abbreviated to DWF and WWF respectively. Dry-weather flow is the flow of sewage generated by activities such as showering and toilet use. In wet weather, rainwater is added to the mix. This can cause major variations in the volume entering the sewer. Our system is perfectly equipped to handle that. However, the approximately 14,500 cubic metres of water that need to be pumped every hour are not the maximum capacity of the system we developed. It can handle considerably more. The reason the maximum here is 14,500 cubic metres is that the wastewater treatment plant downstream of the pumping system cannot process any more.” 

According to Michiel, a second challenge is that the wastewater being pumped past the problem site comes from the four damaged sewer pipes as well as a separate branch connection on site. “That means a system with combined pumps is not enough. Each of the five pipes needs its own dedicated pump set, including a back-up for unforeseen circumstances.”

Temporary pumping system (south side) (Image: ©Vanderkamp, The Dutch Water Engineers).

Tailored solution 

Vanderkamp has once again delivered first-class workmanship in Tilburg-Noord. The system, built mainly from standard components, is a perfect fit for the client’s specific requirements and needs. Marco says: “Because we mapped the flow in each sewer pipe precisely, we were able to determine the optimum pumping and reserve capacity specifically for this project. That was the starting point. We then put the system together using suitable pump sets, fittings, valves and flow meters, among other components. We also made a few minor technical adjustments on site. The result is a perfectly tailored solution and an excellent outcome.” Michiel agrees. “Large pumping volumes and Vanderkamp go hand in hand, as this project has shown once again. We provide the capacity, but also the expertise and the bespoke solution required. We have once again put those strengths into practice here, working superbly with Heijmans.”     

Vanderkamp colleagues Danny Brinkman (left) and Arjan Huisman discussing the work. (Image: ©fotovitalis | Vanderkamp, The Dutch Water Engineers)

Multidisciplinary team
Heijmans and Vanderkamp are pulling out all the stops to tackle the problems in Tilburg-Noord quickly and professionally. Jan Heijmans, business unit manager at Heijmans Infra region South, is highly satisfied with the project’s progress. “Teamwork, buildability and making connections are not just core principles at our multidisciplinary construction company. They also come together in a great way in this special project, where everyone involved is able to demonstrate their specific skills through different disciplines and technologies. The partnership is proving exceptionally successful, thanks above all to the very short lines of communication, clear communication and commitment of the project partners. I am confident that we will complete this major project successfully within the agreed schedule.”

Een zakelijke vraag aan Vanderkamp – The Dutch Water Engineers? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectUnderground infrastructure
  • CompanyVanderkamp – The Dutch Water Engineers