The municipality of Zwijndrecht manages and maintains around 2,500,000 m² of paved surfaces. Approximately 650,000 m² consists of asphalt. In the past, lava was used as a road sub-base beneath a large number of asphalt roads. Several roads with lava sub-bases required major maintenance. 

When preparing preliminary cost estimates for the maintenance projects, Zwijndrecht found that the conventional construction method would require large quantities of lava to be excavated, transported away and disposed of. Poor access to neighbouring residential areas and business parks was another undesirable consequence. Falling weight deflectometer tests were carried out on Ringdijk, Molenweg and Lindtsedijk. The average stiffness measured in the lava sub-base was just 45 MPa, too low for the lava to be reused directly as road sub-base material.

Investigating reuse
Zwijndrecht needed advice on the best way to deal with the existing road sub-bases and had to look for alternative construction methods. One option was to investigate reusing the existing lava. Various studies were carried out to assess whether this was feasible. These included:

  • Determining the stiffness of existing road sub-bases using falling weight deflectometer tests;
  • Preparing and testing trial specimens in a laboratory;
  • Selecting a trial section. 

Trials
Wegbouwkundig Advies Bureau Van den Boom BV, now Lavaplus BV, proposed a possible solution: reuse the lava in situ by mixing it with cement. In 2007, the consultancy had laboratory trials carried out, mixing lava with cement. The average stiffness values measured were 3,500 MPa. These results were submitted to the water authority (WSHD) responsible for the flood defences on which the municipal roads are located. The WSHD considered an average stiffness of around 3,500 MPa far too high for a (stiff) foundation layer in a road pavement on a dike. Dikes are always moving, which can cause significant cracking in the foundation and road pavement. 

The consultant proposed mixing the lava with foamed bitumen and cement. 

This makes the foundation layer more flexible than mixing it with cement alone. The team looked for examples of similar work carried out previously. Research online and in various trade journals showed that lava had not yet been mixed with cement and/or foamed bitumen anywhere. 

The next step was to trial the approach in a laboratory. Test specimens were produced and initially tested for their Marshall value. The results were promising. The specimens were then used to determine stiffness. This test was also successful, producing a stiffness value of 750 MPa, better than the values for commonly used foundation materials such as mixed aggregate (400 MPa) and hydraulically bound mixed aggregate (600 MPa).  

Trial section
Following the positive laboratory results, Zwijndrecht selected a 150-metre trial section on a dike embankment at Ringdijk in 2011. The municipality and the consultancy tested the laboratory results in practice. The trial section is monitored annually. The road structure continues to meet the requirements set by the municipality in 2011.  

Projects using upgraded lava sub-base
Drawing on the experience gained from the trial section, the decision was made to carry out the Herinrichting Ringdijk project (1.3 km) in 2013. Here too, the existing lava sub-base was mixed with foamed bitumen and cement. The same method was then used on Molenweg in Heerjansdam (0.4 km) in 2014 and on Lindtsedijk (3.5 km) in 2018. 

In summary, the following conclusions can be drawn:

  • Reusing the lava sub-bases as part of a circular approach meant that hardly any materials or soil had to be transported to or from the sites;
  • CO2 emissions were significantly lower;
  • Construction times were shorter;
  • Disruption to residents and businesses was significantly reduced;
  • Construction costs for the three projects were around €1 million lower, including VAT costs, than with conventional construction methods;
  • The road pavement is expected to have a longer service life, thanks to the good stiffness of the new road sub-base.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeLower emissions and more reuse
  • SubjectNews
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.