News

Tree surgeon gets to work electrifying its fleet

Kees Weijtmans heeft de drive om vooral niet stil te blijven staan en investeert fors in de elektrificatie van zijn machinepark.
Kees Weijtmans heeft de drive om vooral niet stil te blijven staan en investeert fors in de elektrificatie van zijn machinepark.

With experienced, skilled tree specialists, tree surgery company Weijtmans has been committed to responsible tree and forest management for more than 100 years. The company, based in Udenhout, is investing heavily in electrifying its fleet. “We all have steps to take towards more sustainable business practices. We are deliberately not waiting to see what happens, but are pressing ahead now, even though no one yet knows exactly which direction things will take.” Driven by his personal convictions, Kees Weijtmans is determined not to stand still. 

Kees Weijtmans is reluctant to say whether electrification will ultimately be the end goal. “For now, it is the best step we can take towards a more sustainable society. Practical applications involving hydrogen or other energy sources are still a long way off. That is why we are now investing heavily in electrifying our fleet. We have already had a Doosan DX165W Electric in our fleet for several months, and have ordered a 60-tonne electric truck with a crane, as well as an electric cherry picker and electric company vehicles to transport staff.”

The Doosan DX165W Electric in action.

Tree surgery company Weijtmans currently has 60 vehicles, which Kees Weijtmans says will all be replaced with electric models between now and 2030. “Ordering those vehicles is no problem. Making sure their batteries are recharged time and again is another challenge. In Udenhout, we have a 3×250 Ampere connection and 1,400 solar panels on the roof. That is enough for now, but bear in mind that we had to wait 14 months (!) for that connection. This was one of the reasons we recently took over tree surgery company Kuijpers from Son, for which we immediately applied for a higher-capacity connection. It is due to be installed in early 2023, but TenneT cannot say when power will be flowing through the cable. It could easily be 2024…”

Despite these uncertainties, Weijtmans is pressing ahead with its investments undaunted. “We are looking into energy storage and installing another 4700 solar panels in Udenhout, with the aim of becoming fully self-sufficient in the future.” This gives responsible tree and forest management a double meaning at tree surgery company Wetijmans.    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeLower emissions and more reuse
  • SubjectNews
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.