Steel sheet pile structures ensure stability

Along part of the Gorinchem-Waardenburg dike reinforcement project, the dike cannot be strengthened using earthworks, the traditional solution. At these locations, the existing dike is stabilised with an anchored steel sheet pile structure. Jetmix is supplying the required grouted anchors, including the steelwork comprising walings and anchor chairs, and is also installing the complete system.

First, a few figures: 1,100 grouted anchors, including anchor chairs, and 3,000 m1 of walings. This is the total quantity of materials and equipment that Jetmix is supplying and installing at eleven locations along the Gorinchem-Waardenburg project. “The ‘Waalensemble’ consortium, comprising Heijmans, GMB and De Vries & Van de Wiel, asked us to submit a quotation for supplying and installing the required anchors for the Gorinchem-Waardenburg dike reinforcement project,” explains Marinus de Heus of Jetmix. “We have previously worked on the Diefdijk Asperen and Dijkverbetering Hagestein-Opheusden (HOP) projects, both managed by Waterschap Rivierenland.”
Challenges
In the more than 15 years since its establishment, Jetmix has grown into the Netherlands’ specialist anchoring contractor. The company is part of the Hakkers Groep, a family business that has been operating for almost 150 years. It specialises in installing grouted anchors, anchor piles and foundation piles by drilling, without vibration. According to De Heus, Jetmix’s strength lies in ‘managing the design, production of materials, installation and testing of anchors in-house’. “For this project, we also developed a plan for carrying out the work, from the moment the contract was awarded through to final handover. Key elements of the plan include safety, health, the environment, risk management, disruption and quality. These are important challenges to take into account on this project. Another challenge was to design a safe structure with a design life of 100 years while complying with all applicable laws and regulations.”
Up-to-date equipment fleet
Jetmix owns and operates around ten foundation rigs for its day-to-day work, including dike reinforcement projects. Their operating weights range from 15 to 110 tonnes. “In foundation engineering, equipment is an essential part of the business. That is why we invest every year in keeping our fleet up to date. Four years ago, for example, we invested in a Woltman 90DR foundation rig, which can install drilled foundation piles, anchor piles and sheet piles without vibration. Our machines meet current environmental and ergonomic standards. This enables us not only to contribute to challenging projects, but also to help keep CO2 emissions as low as possible. This is an important requirement for the dike reinforcement works.”
Question about this story? Ask your question
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeFlood protection and climate-resilient water management
- SubjectNews
- CompanyGMB