News

‘Recycled’ Gevlebrug reaches its final destination today

‘Recycled’ Gevlebrug reaches its final destination today

Today marks the start of the final stage of a, quite literally, fine example of reuse. The Gevlebrug, dating from 1930, was yesterday transported from its restoration site at Damen Shiprepair Amsterdam to the other side of the IJ, ready to be installed at its permanent location today.

The lift bridge served to the east of Central Station until 2002, but could not carry the trams to IJburg and therefore had to be replaced. It was then used for a time at Noorderhoofd, an area in the Port of Amsterdam. Following a thorough renovation, the distinctive bridge is now being given a new role as one of the access roads to the new Amsterdam district of Houthavens.

Space

The restoration was carried out by Niron Staal Amsterdam BV and Fa. Evenboer on behalf of Gebr. Beentjes Grond-, Weg- en Waterbouw, in one of the four dry docks at Damen Shiprepair Amsterdam. “It’s great that we still have space in Amsterdam, relatively close to the city centre, to carry out this kind of large-scale work,” says Tjeerd Schulting, director of Niron Staal and Damen Shiprepair Amsterdam.

Dry dock

While Fa. Evenboer restored the existing bridge in the dry dock, Niron Staal fabricated three new bridge decks in its fabrication hall: one road deck, 6 metres wide and 28 metres long, and two pedestrian decks, each just over 3 metres wide and 28 metres long. Once this work was complete, the old bridge, named after the Swedish Baltic port of Gävle, once an important centre for the timber trade with Amsterdam, was transported to the fabrication hall, where the decks were fitted to the existing bridge.

Modular trailers

Last Thursday, the fully assembled bridge was transported from Niron Staal’s fabrication hall to the load-out quay at Damen Shiprepair Amsterdam using self-propelled modular trailers. It was loaded onto a pontoon there and transported across the IJ. Yesterday, the bridge was brought ashore at the Houthavens site, and today the same modular trailers will be used to move it into position.

Question about this story? Ask your question

Who worked on Gevlebrug

  1. restorationFa. EvenboerMentioned in ‘Recycled’ Gevlebrug reaches its final destination today
  2. restoration siteDamen Shiprepair AmsterdamMentioned in ‘Recycled’ Gevlebrug reaches its final destination today
  3. restorationNiron Staal Amsterdam BVMentioned in ‘Recycled’ Gevlebrug reaches its final destination today
  4. natural stoneMeesters InMentioned in Rebuilding iconic Gevlebrug in Amsterdam calls for multidisciplinary collaboration
  5. steelDe Boer StaalMentioned in Steel cut to size for the reclaimed Gevlebrug
  6. cutting workDe Boer SnijbedrijfMentioned in Steel cut to size for the reclaimed Gevlebrug

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectGevlebrug
  • ThemeMaterials and techniques for infrastructure
  • SubjectNews
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.