News

Noordzij achieves >95% reuse of bitumen joints along tram tracks.

Noordzij achieves >95% reuse of bitumen joints along tram tracks.

Noordzij Bitumenverwerking BV from Gorinchem has developed a method that enables more than 95% of bitumen joints along tram tracks to be reused. These joints are still treated as waste and disposed of and incinerated. Noordzij wants to raise awareness among local authorities and the tram and road construction sectors of this opportunity for circular construction and to reduce CO2 emissions by reusing bitumen joints along tram tracks.

Reuse is essential

The Paris climate agreement established the need for a waste-free economy. It set the goal for the Netherlands to become 100% circular by 2050. Resources must be used more efficiently. The government has made € 80 million available for projects that contribute to the transition to a circular economy and to reducing CO2 emissions. This underscores the urgency of doing business circularly.

Noordzij recognises the importance of reducing CO2 emissions and wants to contribute to a circular economy. “Bitumen joints along tram tracks are only a small part of an infrastructure project, but processing bitumen accounts for 100% of our business,” says Marion Noordzij, co-owner of A. Noordzij Bitumenverwerking BV. “I realise that we work with a material that is a by-product of petroleum. Unfortunately, there are still no good, sustainable alternatives to bitumen in road construction. This makes it all the more important to use bitumen sparingly and prevent waste.”

Reducing CO2 emissions

Bitumen joints along tram tracks are currently treated as waste and disposed of and incinerated. New bitumen must then be extracted and processed for use in new joints. Although exact figures are not available, the Emission Factors List on www.CO2emissiefactoren.nl provides a consistent set of key figures on CO2 emissions. It states that incinerating bitumen produces 3.381 kg of CO2 per kg of bitumen. The extraction and processing of bitumen also generate emissions. Recycling bitumen is not entirely CO2-neutral either, but it significantly reduces CO2 emissions compared with current practice.

Responsibility of local authorities, tram operators and contractors

Every recycling process for bitumen joints along tram tracks starts with a renovation or new-build requirement from a local authority or tram operator. The asphalt alongside the tram tracks needs replacing, or the tram tracks need to be renewed or renovated. “Many clients and contractors are still unaware of the opportunities for reusing bitumen joints along the tracks,” Marion Noordzij continues. “Ultimately, they decide whether a bitumen joint becomes waste or is recycled. We hope to inspire them to choose reuse in future projects.”

Approved method

Noordzij begins the recycling process by gouging out the bitumen joints along the tram tracks. The bitumen is then collected and transported to the recycling site. It is melted, screened and stored again. More than 95% is suitable for reuse. The remaining material (<5%) is sent to a waste processing company. In a legal opinion, the Ministry of Infrastructure and Water Management has recognised Noordzij’s method of gouging out and recycling bitumen as “continued use”. The gouged-out bitumen is therefore no longer classified as “waste”.

“We are still investigating a number of issues, such as how many times bitumen can be recycled. We want to continue to professionalise bitumen recycling,” Marion Noordzij concludes.

About Noordzij

Noordzij Bitumenverwerking BV has more than 30 years’ experience in applying bitumen on infrastructure projects. The company is the market leader in creating joints along tram tracks and uses unique rail-joint saws for this work. Noordzij’s staff developed these machines to meet specific requirements, drawing on their practical experience. Noordzij is known in the industry as an experienced contractor. It is an innovative family business whose team takes great pride in and is deeply committed to its projects. In addition to rail joints, Noordzij also installs flexigoot and repairs cracks in asphalt, as well as other bitumen joints. For more information, visit www.noordzij.eu.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeLower emissions and more reuse
  • SubjectNews
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.