‘You don’t see our work, but its importance is all the greater’

Vibration-free drilling is increasingly becoming the standard. Franki Grondtechnieken is a specialist, brought in for complex projects. This calls for a high degree of improvisation and a solutions-focused approach.
Franki Grondtechnieken traces its origins back to the early 1900s. Edgard Frankignoul founded Compagnie Internationale des Pieux Armés Frankignoul after obtaining the patent for the Franki pile in 1909. Founded in 1934, Franki Grondtechnieken is part of Franki Foundations Belgium, alongside sister companies in France and the United Kingdom. The entire Franki group has been part of BESIX Group since 2008.
The foundation for major projects
At the helm of Franki Grondtechnieken is Jan-Wim Verhoeff. He is proud of the work they do, and rightly so: a quick look at the projects they have worked on shows that they are no small undertakings. These include the Noord-Zuid line, Spoorzone Delft, the entire excavation pit and foundations for the new RIVM and CBG building in Utrecht, and the Groene Boog project, connecting the A16 to the A13. “We literally lay the foundations for these projects,” says Verhoeff. “You don’t see our work, but its importance is all the greater. For example, the foundation piles for RIVM and CBG in Utrecht are 60 metres long and 2 metres in diameter. The building must be so stable that it is vibration-free. As experts in specialist foundation techniques, such as vibration-free piling and the installation of cast-in-situ walls, we are called in for precisely these kinds of projects. On the one hand, we carry out specific foundation works, but we also deliver complete excavation pits, taking over the main contractor’s coordinating role.
An underground puzzle
When working on underground foundations, Franki’s teams regularly face major challenges. “The Noord-Zuid line is a good example. We carried out excavation work for the station walls. It is in the middle of Amsterdam, so space is limited, while you are working with large excavators. This also requires close attention to the safety of our staff and the public. Getting all the materials and equipment to site is a logistical puzzle too. The same applies to our work in Delft, where we excavated the underground tunnel walls for the railway tunnel. But perhaps the biggest challenge in our work is that, so to speak, we are digging blind. Of course, thorough ground investigations are the foundation of our work. But they do not guarantee that you will not encounter anything unexpected. Because we have a wide range of techniques at our disposal, we can quickly come up with a solution in such situations. That is Franki Grondtechnieken’s great strength.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.