Valuable formwork advice

The new N69 includes nine bridges and viaducts, designed to blend into the landscape.
During the preparatory phase, MZ Bekistingen worked with Boskalis on how to construct the edge formwork for the curved decks and was invited to submit a quotation. This ultimately led to a series of smaller contracts.

“We have a long-standing relationship with Boskalis, and were asked in that capacity to advise on how to construct the edge formwork for the curved decks,” says Pascal Rijkers of MZ Bekistingen. “Our proposal was based on prefabricated formwork that could be reused. At a later stage, the work was carried out directly on site using formwork ribs supplied by us. We would like to be involved earlier and work with clients to help secure future projects. It is about investing in a relationship and finding the best outcome for everyone. We proved that on the N69, too. For example, we engineered and manufactured the double-curved formwork for the cycle gutters on our 5-axis CNC machine, enabling it to be used no fewer than eighteen times on site. We also made the tapered end pieces beneath the decks, allowing each deck to be poured in one go onto the abutment. We always work with our clients in this way. Anything can be made, as long as it is properly thought through,” Rijkers concludes.
Question about this story? Ask your question
Who worked on N69
- clientProvince of North BrabantMentioned in Broad support as the foundation of Brabant’s greenest road
- traffic management measures
BUKO InfrasupportMentioned in Traffic flow and safety key to construction of Grenscorridor N69 - supplied formwork ribsMZ BekistingenIn this story
- reinforced earth structures
Voets Gewapende GrondconstructiesMentioned in Temporary and permanent reinforced soil structures - mixing plantGebroeders Van den Brand en Van OortMentioned in 40,000 tonnes of bound asphalt granulate (AGRAC)
- transportbedrijf en grondbankVan Grunsven en Langenhuijzen TransportMentioned in Guaranteed supplies of earthworks materials
Keep following this
Get an email when a new story is published. No account needed.
- ProjectN69
- ThemeMaterials and techniques for infrastructure
- SubjectBridge construction
- CompanyMZ Bekistingen