The design of the new Prinses Amaliabrug and Kogerpolderbrug

The renewal of the Beatrixbrug and Kogerpolderbrug is part of the ‘N244-N246 Trajectbenadering’ project by the Province of North Holland. The Beatrixbrug was also renamed the Prinses Amaliabrug, which was the first of the two bascule bridges to be replaced, entering service in 2019, ahead of schedule. The Kogerpolderbrug also entered service early this year.
Minimising maintenance and disruption
One of the key requirements for replacing the Prinses Amaliabrug and Kogerpolderbrug was to minimise maintenance. The Province of North Holland also stipulated that the route must not be changed. This meant that both bridges had to be built in the same locations as the existing bridges and that the road alignment could not be adjusted. Minimising disruption, and limiting and shortening construction activities on site as far as possible, was another key factor in the bridge design.
The bridges comprise two approach spans, a bascule chamber and a steel leaf. The Prinses Amaliabrug has two traffic lanes and a segregated cycle path. The Kogerpolderbrug has three traffic lanes and a segregated cycle path. The architectural designs of the two bridges are similar in many respects, so that, in line with the design quality plan, they clearly belong to the same family. A tapered deck and piers with pointed heads create a more slender appearance.

Existing piled foundation
The existing bridges were completely demolished. Only the existing piled foundations were left in the ground. Since the new bridges are in exactly the same positions as the existing ones, designing the new piles was a major challenge. Archive documents and as-built drawings were used to map the existing pile layout. The new pile layout was designed around it, with assumed deviations incorporated into a 3D model. This model proved to match the actual conditions very closely, meaning that only one pile had to be moved during installation, and the new position had to be justified by calculation.
The bascule chambers were designed on the assumption that they would be built in a cofferdam without underwater concrete. This shortens the construction period. This resulted in a relatively shallow chamber, particularly for the Prinses Amaliabrug. As a result, the counterweight has a short lever arm and needed to be made of a high-density material, in this case steel billets. This was less of an issue for the Kogerpolderbrug, where the deck is higher. The ballast box could therefore be filled with heavyweight concrete.
The approach spans of the Prinses Amaliabrug are short, allowing the use of solid-web beams. The Kogerpolderbrug uses box girders. On both bridges, the decks are rigidly connected to the bascule chamber and abutments using wet joints and flexible joints. This eliminates the need for joint profiles that require maintenance.
The piers were built using precast U-shaped units. Units with circular openings were placed over the steel tubular piles on welded brackets. The piles had already been filled with concrete and fitted with projecting reinforcement. After the units were installed, a reinforcement cage was fitted for each pier and the units were filled with concrete. This structurally connected the piles, precast concrete units and piers. Once the precast deck beams had been installed and the deck slab cast, the deck was also structurally connected to the piers. This construction method made it possible to build the piers without a cofferdam or dewatering, while minimising disruption to shipping.
The reinforcement was modelled in its entirety using 3D software. At the factory, as much of the reinforcement as possible was assembled into cages, which were then transported to site as complete units. The 3D model and prefabrication resulted in very neat cages that fitted together well.

Movable section
The design of the movable sections is essentially identical for both bridges. They are driven electromechanically by means of a crank-and-connecting-rod mechanism. A series-connected drive was selected. In broad terms, this comprises motor and gearbox 1, an intermediate shaft, gearbox 2, a crankshaft, a crank arm, a spring buffer and the bridge leaf. The long intermediate shaft reduces the stiffness of the operating mechanism and limits the forces generated.
To minimise maintenance, the steel leaves were designed as enclosed, box-shaped steel structures, sealed airtight all around. Closing off the underside reduces the area requiring protective treatment compared with a conventional design with an open underside. The bridges are also easier to maintain thanks to their flat finish. The bottom plates serve not only as closure plates but also act structurally as the bottom flanges of the main girders and cross-girders.
The directly trafficked deck has a ‘conventional’ design: the deck plate thickness and weld details comply with NEN-EN 1993-2. The troughs pass through the cross-girders, with the cross-girder webs closely enclosing them. Using troughs that pass through the cross-girders allows the trough webs to be welded continuously to the deck plate along the full length of the roadway using an automated welding process.
Two tail girders connect the enclosed deck structure to the ballast box. The narrow bascule chamber necessitated the use of relatively tight vertical radii in the bottom flanges.