Bridge construction

The design of the new Dokbrug in Vlissingen

Productie op bouwlocatie van de betonconstructies.
Productie op bouwlocatie van de betonconstructies.

Work is currently well underway on the Scheldekwartier in Vlissingen. The Scheldekwartier will be a new residential neighbourhood in the city centre of Vlissingen, on the site of the former De Schelde shipyard.

The new Dokbrug over the Dok will be an important link and a defining feature of the neighbourhood. The new bridge will be built slightly west of the old bridge, which will be removed once the new bridge is complete. 

Buro Ma.aN designed the bridge’s architecture, drawing inspiration from shipbuilding, for which Vlissingen is historically renowned, and the nearby Scheldekraan. Iv-Infra further developed the design technically on behalf of Gemeente Vlissingen, produced the detailed design, prepared the construction contract and put the work out to tender. The architectural design covered only the external form. To create a functioning movable bridge, the entire structure was modelled in 3D. In close collaboration with the architect, various changes and optimisations were made to arrive at a fully functional design. 

Artist’s impression of the Dokbrug. (Source: buro Ma.aN)

Counterbalancing

The Dokbrug is a bascule bridge, counterbalanced by two large masses at the rear of the balance arms, which are mounted on top of the bascule towers. Movable bridges are generally balanced so that they tend to close under their own weight, with relatively little force required at the bearing end. The bridge deck weighs approximately 100 tonnes, and each balance arm weighs approximately 45 tonnes. The balance arms are reasonably well balanced in themselves, so it is mainly the weight of the bridge deck that needs to be offset by the ballast at the rear of the balance arms. This requires approximately 145 tonnes of ballast, divided between the two ballast boxes. Several changes were made to the architectural design in collaboration with the architect to make room for this mass. The balance arms were lengthened slightly to make the most effective use of the mass, since the further it is from the pivot point, the greater its effect. To prevent the rear of the balance arms from hitting the railings, the bascule towers were raised by the same amount. The centre of gravity of the ballast box was also lowered slightly, so that the bridge will tend to close under its own weight even when open. This means the bridge can still be closed in the event of a fault or power failure. 

Bridge chamber

The bridge rests on two concrete piers in the dock. The architect’s original idea was to house the drive system and electrical installation at the bottom of the bascule towers. However, further design work showed that these spaces were too small to accommodate all the components while meeting current requirements for the safety and maintainability of a movable bridge. Enlarging the shoulders of the bascule towers would have detracted too much from the bridge’s appearance. An alternative was to build a chamber beneath the bridge. The original architectural design allowed 2 m of vertical clearance beneath the bridge, exactly as required by the water board and the asset manager. This left no room for a chamber with headroom in the pier supporting the bascule towers, unless the floor were built further below water level. This would have significantly increased costs, as it would have required cofferdams. The dock is approximately 7 m deep in places. Given the limited budget, it was decided to increase the vertical clearance beneath the bridge by 0.6 m. This avoids making the approaches too steep and keeps the design as close as possible to the architect’s original concept. It also creates just enough space for a chamber with headroom. This space can house the electrical installation, as well as the hydraulic power pack. The chamber can also be built at water level without the need for a cofferdam. 

Installation of the balance arms.

Bridge drive system

The bridge is operated by two electro-hydraulic cylinders installed at the top of the bascule towers. Various options for the drive system were assessed. Taking into account factors including fit, purchase and maintenance costs, impact on the architectural appearance and maintainability, it was decided to house the drive system in the bascule towers. The cylinders must be safely accessible for installation, inspection and maintenance. The original design did not quite provide enough space for this. Since the bascule towers had been made slightly taller to allow for longer balance arms, it made sense to increase their cross-section proportionally as well. This created just enough space to ensure the cylinders could be accessed as required. The cylinders push the balance arms upwards, setting the bridge in motion. Each bascule tower has two access doors. Behind them are a staircase leading down to the chamber and a ladder for climbing up into the towers. Two levels have been created inside the towers, providing access to the underside and top of the cylinders for inspection and maintenance. 

Construction

The project was put out to public tender on the basis of a RAW specification and awarded to aannemingsbedrijf Maas. Construction work is now in full swing on site. Completion is scheduled for March 2021. Iv-Infra is supporting Gemeente Vlissingen throughout construction, providing contract management, day-to-day supervision and review of the contractor’s documents.     

Question about this story? Ask your question

Who worked on it

Dokbrug in Vlissingen

  1. architectBuro Ma.aN
  2. Construction managementIv-Infra
  3. contractoraannemingsbedrijf Maas

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDokbrug
  • SubjectBridge construction
  • CompanyBuro Ma.aN
  • CompanyIv-Infra
  • Companyaannemingsbedrijf Maas
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.