The Amstelstroombrug will be an ecological showcase

It is fair to call this a distinctive design. The bridge that the Municipality of Amsterdam is having built over the Duivendrechtse vaart will contribute to the city’s ecological network. The design is by Mobilis B.V. and VenhoevenCS Architecture & Urbanism, with ecological input from consultancy Smartland.
GWW speaks to project leaders Arno Bolder (Mobilis) and Edwin Abbink (Municipality of Amsterdam) about the green design and the role the bridge will play in connecting the Amstelkwartier with Joan Muyskenweg for pedestrians, cyclists and motor traffic.
Going beyond the requirements
“The brief included requirements for the design, maintainability and ecology,” Edwin begins. “The bridge had to do more than provide an infrastructure link. It also had to create an ecological link with the surrounding area and contribute to biodiversity.” Mobilis and VenhoevenCS Architecture & Urbanism won the tender. Arno says: “We went a step further than the municipality asked. That also fits with Mobilis: we have many years of experience with wildlife crossings and fauna passages. We understood the brief very well, it felt like coming home. By involving ecological consultancy Smartland in the design, we were able to respond very precisely to the local ecology. Mobilis B.V. is delivering the project in partnership with its regular partner Van Gelder B.V.”
The result will be a bridge that contributes to the ecological network, with a flower-rich central reservation, nesting boxes for house martins and barn swallows in the bridge beams, bat maternity roosts in the central piers, and nests for kingfishers and sand martins in the piers at the sides. “It is wonderful to be able to contribute to biodiversity in an urban area like this,” says Edwin. “The bridge will also include features for plants and animals that have become relatively rare in the city centre, providing shelter, nesting and roosting places for bats, birds, fish, bees and bumblebees. In this respect, Mobilis and VenhoevenCS Architecture & Urbanism went beyond the brief.”

A world of its own
Ecologically speaking, the bridge over the Duivendrechtsevaart will be a world of its own, with all its features for promoting and sustaining biodiversity. “There is also a strong focus on greenery,” Arno continues. “The green central reservation on Amstelstroomlaan will continue across the bridge, complete with its own water storage. Openings in the bridge deck will let daylight through beneath it.”
Sustainable design
TBI company Mobilis specifically chose concrete for the construction of the bridge. Arno explains: “This means less maintenance is needed, for example, there is no need to paint it. The water piers have been positioned so that no fender system is needed. That also makes a huge difference to maintenance costs.” Edwin responds: “That was another aspect that made the bid from Mobilis and VenhoevenCS Architecture & Urbanism stand out. The consortium has also allowed for possible future changes. The central reservation is open above the embankments, but designed so that a third lane can be added later if needed. All in all, the D&C brief was fairly abstract, which is quite unusual for the municipality.”
The digital site office
At the time of the interview, the consortium is working on the foundations for the water piers and the piled foundation for the abutment on the eastern side, as well as setting up the site. “You know what’s unusual?” asks Arno. “Yesterday we held our 7th site meeting, online, of course. I’ve never met the client’s team members in person. We’re literally together in a digital site office…” Edwin adds by way of conclusion: “What’s even more unusual? Despite missing face-to-face contact, we have a very close and positive working relationship. That’s quite unique. I think both teams communicate well.”
Have a business enquiry for Mobilis? Get in touch
Who worked on Amstelstroombrug
- architectVenhoevenCS Architecture & UrbanismIn this story
- landscape architectsSMARTLAND landscape architectsMentioned in Nature-inclusive Amstelstroombrug opens
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAmstelstroombrug
- SubjectBridge construction
- CompanyVenhoevenCS Architecture & Urbanism
- CompanyMobilis
















