Bridge construction

Pedestrian and cycle bridge at Afferdense en Deestse Waarden completed

Pedestrian and cycle bridge at Afferdense en Deestse Waarden completed

The new pedestrian bridge near Afferden-Deest in Gelderland has recently been completed. It is a special project: a fully timber bridge measuring 149 m long and 3 m wide, located in the floodplains of a secondary channel of the Waal.

The pedestrian and cycle bridge in Afferden, commissioned by Boskalis, is made entirely of timber. Bridges of this length are often built from other materials. However, this bridge is located in the floodplains of a newly created secondary channel of the Waal and had to blend into the rural surroundings. It also had to withstand the strong river current, leading to a design in FSC-certified Azobé timber.

Favourable life cycle cost

Adri Timmerman, commercial manager at Flora Nova Constructiewerken, sees a growing trend towards building more timber bridges. “In terms of reducing environmental impact, timber performs far better than concrete, steel or plastic. More and more public authorities are recognising this. When environmental costs are expressed in euros using the Environmental Cost Indicator (MKI), the total environmental costs over the lifetime of a timber bridge are by far the lowest. This results in a favourable life cycle cost.”

Flora Nova Constructiewerken, based in Ophemert, specialises in civil engineering structures, from bridges and lock gates to observation towers and outdoor furniture. The company places great importance on environmental considerations and cherishes the traditional craftsmanship embodied in this bridge. The maximum span of a timber bridge is around 12 m, but trussed girders or finger-jointed timber can achieve spans of up to 25 m. Hardwood arch and suspension bridges with even longer spans can also be built.

Service life can be extended by many years

Flora Nova Constructiewerken has developed an in-house programme to significantly improve the detailing of timber bridges. “Building on the CUR report published a few years ago, we have introduced a number of improvements,” says Timmerman. “Regular inspections and proper maintenance can extend a bridge’s service life by many years, enabling it to last at least 50 years. That is why we offer an inspection subscription, helping to ensure its safety. Flora Nova does not work exclusively with timber, by the way: other materials and combinations of materials are also used.”    

Have a business enquiry for Boskalis Nederland? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBridge construction
  • CompanyBoskalis Nederland
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.