A section of the new viaduct is being cast in situ. A temporary support structure has been developed for this purpose, supported by special heavy-duty props supplied by Brand Infrastructure Services.
The forces involved are so great that the props were flown in from the United Kingdom. We spoke to Chakir Dahia, Project Manager Civil & Infrastructure at Brand Infrastructure Services, part of multinational BrandSafway.
BrandSafway is a leading provider of specialist services to the global industrial, construction and infrastructure markets. It supplies access systems, shoring and formwork, industrial services and related solutions to more than 30,000 customers worldwide. BrandSafway was formed in 2017 through the merger of Brand Energy & Infrastructure Services and Safway Group. “With our roots in America, safety is our top priority. It is in our DNA,” says Dahia. “For this project too, we clearly identified the risks in advance and worked out how to minimise them.”

Safety Performance
“Discussing the bottlenecks and challenges at an early stage makes it possible to develop a suitable solution,” Dahia continues. “The main challenge here is the location. Our props will be installed on the work islands between the barriers on the A4. This means the planned work can only be carried out during a road closure, which requires thorough preparation. And that is precisely where we stand out. We have all the disciplines under one roof, enabling us to carry out this type of work independently, without relying on third parties. We handle the engineering, product supply and installation ourselves. We provide the complete package, with Safety Performance leading the way.” Dahia has noticed that more and more Dutch clients are making safety their number one priority, rather than awarding a project on price alone. “That is a positive development,” he says. “Our ‘five pillars of safety’ have given us a strong and stable foundation on which we have built our excellent safety performance and culture, and which genuinely drive our strategic safety initiatives worldwide.”
For the viaduct, Brand Infra Services is supplying a total of 70 heavy-duty props and the required rebar scaffolding. “The props will be subjected to an enormous load,” says Dahia. “Each of our props can withstand 200 kN. The maximum forces involved here have been calculated at 150 kN, so we have built in a substantial safety margin. During road closures, the props will be installed and secured using a crane, allowing Heijmans to carry out the concrete pours. Once the work is complete, we will dismantle the props carefully and transport them to the next project.”