Although the team at Flora Nova Houtconstructies has designed and built many striking and beautiful timber structures, the so-called giraffe bridge for Bellewaerde Park, an aquatic and animal park in Belgium, was a particularly special project. They are especially proud of the end result: a 110-metre-long, natural-looking bridge made entirely of timber, combining four timber species.
Natural-looking structure combining four timber species
First, a brief introduction to Flora Nova Houtconstructies: the company designs and builds timber civil engineering structures and public features for outdoor spaces. Its clients are often local authorities, water authorities, provinces and contractors. According to Lennert Joore, manager of structural works, the company’s strength lies above all in the fact that “we have extensive knowledge of and experience with timber, combined with steel, concrete and plastics. This puts us in an excellent position to take care of all aspects of a wide range of projects for our clients.”

On the wish list
The opportunity to design and build the giraffe bridge for Bellewaerde Park came their way. “We’re passionate about our craft and create beautiful structures and works of art. Building something for a theme park or wildlife park had been on our wish list for a long time. The bridge runs around the giraffe enclosure and allows visitors to come face to face with the giraffes at a height of 5 metres. We were delighted to get the chance!”
Combining timber species
At Bellewaerde Park, the giraffe bridge is called the Savannabrug. It had to meet a number of requirements: it had to be made entirely of timber and look natural, rather than follow a straight line. Four specific timber species also had to be used: Cloeziana for the piles, Azobé for the supporting structure, Bilinga for the deck and Robinia for the handrails. “These timber species are used elsewhere in the park, hence this specific requirement. The bridge’s handrails are made of rope, by the way. We’re familiar with this too, thanks to our experience with play equipment.”
Prefabrication
The design was based on an artist’s impression. “From there, we developed the technical drawings in collaboration with the client, until we had a buildable design that met all the requirements and specifications. We were also responsible for construction and installation on site. We prefabricated as many components as possible and assembled the bridge on site in around four weeks.”
The team is proud of the result: “We can really be proud of our work. This exceptional bridge is an excellent calling card for us. We hope to develop more striking structures and works of art for wildlife and theme parks in the near future.”
Question about this story? Ask your question
Who worked on it
Savannabrug
- clientBellewaerde Park
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSavannabrug
- SubjectBridge construction
- CompanyBellewaerde Park