Repair is not only more cost-effective, it is also better for the environment.

The Netherlands and water: two inextricably linked elements. We protect ourselves from water by building dykes, bridges and locks. We make use of water through our ports, rivers and canals. To continue doing so in the future, many water-related structures need a major overhaul. Although these structures are often only partially damaged, many municipalities, provinces and water authorities still opt to renew timber structures rather than repair them. This not only costs a great deal of money, but also results in high CO2 emissions and the waste of tropical hardwood. 

Timber in water engineering

When renewing timber structures, materials such as concrete, composite and steel are often chosen. In addition to being expensive, these materials also have a heavy environmental impact, as shown in the comparative Life Cycle
Assessment (LCA) for mooring piles in Fig. 1. Replacement with composite causes by far the greatest environmental damage, followed by replacement with steel, concrete and timber. Timber repairs, by contrast, have by far the lowest environmental impact.   

Figure 1. Environmental costs of mooring piles when replaced and repaired. Environmental costs of cycle bridges over different service lives. A timber cycle bridge has by far the lowest environmental impact over all service lives, even when it is replaced during that period. Source: ‘Comparative LCA study: determining the sustainability score of bridges constructed from steel, concrete, composite and timber’, commissioned by the Netherlands Enterprise Agency (RvO).

Timber service life

When replacing timber with steel, concrete or composite, it is often argued that timber does not have a long service life, making steel, concrete or composite more sustainable. However, research commissioned by the Netherlands Enterprise Agency (RvO) shows that timber, even when replaced or refurbished during its service life, still has the lowest environmental impact, making it the most sustainable option (see Fig. 2). In addition, replacing timber with composite, steel or concrete causes considerable disturbance to the surrounding area due to pile extraction and driving.

Repair rather than replacement

In collaboration with TU Eindhoven, Protekta developed a restoration method for timber structures in 2009 following extensive testing. The method restores the structure to its original strength and is patented as Protek Aqua©. It uses a proprietary epoxy that has been tested for tensile and flexural strength, bond durability, environmental impact and the effects of temperature differences (coefficient of thermal expansion). Protekta provides a twenty-year guarantee on the work carried out using this repair method.

Figure 2. Environmental costs of cycle bridges over different service lives. Environmental costs of mooring piles when replaced and repaired. Repairing a timber mooring pile has 7 times less environmental impact than replacing it with a new timber mooring pile. Source: ‘Comparative LCA of mooring piles (repair, timber, steel, concrete, composite)’, carried out by Stichting Hout Research Wageningen (SHR).

Water engineering timber repair specialist

Restoring rather than replacing preserves historic timber structures, helping to safeguard protected village and townscapes in the Netherlands. Repair rather than replacement also reduces environmental damage, including through much lower CO2 emissions. As well as being the most sustainable option, restoration is also the most cost-effective, because the problem is addressed locally and no sound tropical hardwood is wasted. 

For these reasons, over the past ten years more and more municipalities, provinces, contractors and water authorities have chosen our Protek Aqua® repair method for restoring locks, bridges, fender structures, mooring piles and dolphins. Protekta is working with its clients to build a sustainable future.   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.