BouwMat

‘Red pumps’ conquer the world

‘Red pumps’ conquer the world

With more than fifty years’ experience in water pumping, Van Heck Group has become the world market leader. The ‘red pumps’ are deployed around the world on projects of every kind. The family-owned business is also a familiar presence in the Netherlands and a trusted partner to many water authorities. Managing director Jeroen van Heck talks about the impact of climate change on water management and water quality.

Gemaal Spijksterpompen

“Water management in the Netherlands is geared towards draining water away very quickly,” Van Heck begins. “As a result of climate change, we are increasingly facing heavy rainfall, but also extreme drought. We know how to deal with heavy rain by now, but storing water is still something we are getting used to. Our country is not yet well prepared for prolonged periods of drought. This also has a direct impact on ecological water quality. That became clear in 2018, when the area inland from the Markermeer near Muiden, among others, experienced the first signs of salinisation. The entire ecosystem is thrown out of balance. At the water authority’s request, we hurriedly installed an emergency system to pump water from the lake into the area and prevent salinisation.”

Van Heck has a huge fleet of pumps, all in its familiar red. So far, the drought this year has been ‘just’ manageable and, according to Van Heck, apart from one or two situations, no additional measures have been needed. But the situation can change at any moment. “After all, we have no control over the weather. In any case, we are able to respond quickly and effectively. The system installed at Muiden to prevent salinisation, no small undertaking with a capacity of 45,000 m3/hour, was operational in just three days. We can help with small projects too. For example, in Hamburg we supplied very small, quiet and energy-efficient pumps to irrigate meadows in spring, creating a better environment for meadow birds. This is an issue in the Netherlands too.”

At the water authority’s request, Van Heck hurriedly installed an emergency system in 2018 to pump water from the Markermeer into the area and prevent salinisation.

Water management is the responsibility of water authorities, and in the Netherlands it is clearly organised. “We should be grateful for that,” says Van Heck. “In the Netherlands, water authorities often act before the public notices any signs of impending ‘disaster’. In other countries, responsibility is often spread across different organisations, which can make things difficult. For extreme rainfall in the Netherlands, we have developed emergency plans for several regions together with water authorities. The plans set out in precise detail what steps need to be taken and which emergency systems should be deployed. They even cover informing a local authority if, for example, a road needs to be closed so the pumping system can operate. This is something Van Heck is exceptionally good at: managing projects of every size from start to finish.”

Van Heck supplies pumping systems for a wide range of applications around the world, including cable and pipeline installation, dredging and civil engineering works. One system, for example, is operating at Russia’s easternmost point, near Japan, to support Van Oord’s dredging work, while the ‘red pumps’ are a familiar sight in Australia.     

Question about this story? Ask your question

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBouwMat
  • CompanyVan Oord
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.