BouwMat

Prefab: a diamond in the making

Prefab: a diamond in the making

At last, we are beginning to realise that prefabricated construction is the future. When the pressure is high enough. Growing staff shortages. High costs of rework. Unwanted nitrogen deposition. CO2 reduction. Safer construction. Better working conditions. Production unaffected by the weather. Modular construction. The circular economy. Familiar terms that suddenly take on enormous added value when you work with prefab materials. Prefab is serious business.

Protonde Ermelo.

Ready-to-install construction kits

Leicon has been doing just that for years. In climate-controlled factory halls,
Leicon produces concrete elements for infrastructure projects, which are assembled into complete construction kits. Concrete elements, complete with all kinds of fittings, are delivered ready to install on site. Elements with any preparation and drawing-board errors ironed out in advance. Elements that have been inspected before they even leave the factory. So construction teams can get to work quickly, efficiently and without errors. “In and out.” “On and over.” Complete bus stops with guidance paving, tactile tiles and recesses for the bus stop sign. Six prefabricated elements are all it takes to build an accessible 18-metre bus stop. Where there was grass on the verge yesterday, there is now a complete bus stop. Installed in the morning, ready for passengers to board and alight in the afternoon. A complete roundabout in one weekend. No problem. All the building blocks are prepared in the factory and assembled on site into a single structure. The road is closed on Friday evening. Open again on Monday morning. Minimal disruption. Lower emissions. And if the roundabout needs to be moved in the future, we can lift the elements and rebuild it elsewhere, using the same elements. That is the advantage of modular construction. 

Protonde in Terneuzen.

Sustainable concrete products

And Leicon continues to innovate. Our precast concrete products are becoming increasingly sustainable. In 2018, we completed a project in which 100% of the sand and 100% of the gravel were replaced with 100% recycled sand and recycled concrete aggregate. The traditional steel reinforcement was also replaced with fibre-reinforced polymer. Reflective material was added to the surface layer of the elements, allowing the street lighting in the area to be turned down a notch. Just a few examples from practice, made possible by clients with the courage to take a chance. Clients who do not just talk about innovation, but dare to put it into practice. Actions, not words. Because it is necessary, and because it is possible. Prefab: a diamond in the making.     

www.leicon.nl

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeMaterials and techniques for infrastructure
  • SubjectBouwMat
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.