No matter how hard the ground, infrastructure projects will always be about people

We know her from the ‘Women at the Top’ feature. Marsha Goosens told her story in issue 3 of this magazine. As an Operational Stakeholder Manager in infrastructure, she has established herself in our sector. You could read about how she balances work with a busy family life. What we didn’t tell you is that the Goosens household is a true ‘infra marriage’. They even speak the same jargon around the kitchen table. Michiel Goosens is one of the partners at Aratis, consultants in procurement, contract management and process management.
We talk to Marsha and Michiel about the search for connection in civil engineering. About a shared mission, people and the ‘softer’ side of our ‘hard’ sector.

Installation of the Borssele Alpha platform, a project by Aratis.
Full circle
The pair met in 1997 while studying Civil Engineering at the HTS in Rotterdam. “We graduated together in 2000, having worked on a project for a new way of handling containers. The project even won the Infratech Innovation Award,” Marsha begins. “As a couple, we started our careers on the same project, before our professional paths diverged. But 20 years later we found ourselves working on the same project again, this time the ‘Container Exchange Route’. So we had come full circle. Although we had spent many years pursuing our own paths at different organisations and on projects on both the client and contractor sides, on the CER project we discovered that we had exactly the same views on collaboration.”
Michiel: “After 20 years, we know that technical problems can always be solved, fortunately. The real problems are to do with relationships and communication. In that respect, our ‘infra marriage’ is a good metaphor for what happens at work. Everyone involved in a project should really enter into a kind of marriage, promising to support one another through good times and bad. One in which you trust and treat each other with respect, as equals. That’s when great things happen, and you can think of a successful project as your child. I think you can imagine the conversations we have over dinner.
You’d be hard pressed to follow them if you weren’t familiar with our industry.”
Finding better contract models
“Drawing on the experience we’ve gained at Aratis over the years on both the client and contractor sides, we mainly work with clients to find better contract and procurement models.
We live in a time when everyone is looking for ways to manage risk in major projects. The main approach has been to keep changing contract models. Initially, integrated contracts led to a shift of risk to the market that was not always proportionate. Today, alliances and construction teams are also being used more often, with a more balanced allocation of risk. That’s a positive development,” Michiel explains.
“At Aratis, we’re in no doubt that, while a sound contractual framework remains important, the solution also lies in the softer side of things. Let’s treat each other as people, with respect. Give each other room to work on a project, be considerate, use our common sense, keep thinking ahead and, above all, understand the subject matter. That’s how you deliver a good project and make work enjoyable for everyone. This approach is now being put into practice on several projects.”

Prinses Alexia wind farm, an Aratis project.
Good preparation takes time
“You need to spend time at the outset of a project to eliminate differences in interpretation,” says Marsha. “That prevents people in the field from speaking different languages. It takes time and courage to build a foundation of trust. The fact is that clients and contractors see the world differently. It’s unrealistic to expect those differences to disappear completely during a project. However, you can start a project with the same intentions, so that when things go wrong, you can find a solution together.”
Michiel adds: “On the client side, we often spend a long time getting a project off the ground properly. Two years of preparation, then the procurement process, and market parties are expected to get to grips with all this knowledge within the tender period? That’s possible, but only if you get everything in order beforehand, and especially at the start of a project, while also allowing for the contractor’s interpretation. That’s some of the work we do at Aratis.”
A bona fide code of conduct
A code of conduct was drawn up for the CER, setting out a number of clear core values. “We made this code of conduct part of the contract. If someone wants to make changes, they have to act in accordance with it,” Michiel explains. “At Aratis, together with other professionals in the sector, we’re developing a service model to help clients and contractors achieve project objectives through practical measures and human connection, so it doesn’t remain just an intention. We’re convinced that this approach not only delivers great projects, but also helps people grow as individuals. That means you can enjoy going to work on our long-running infrastructure projects. Isn’t that what we all want?” Michiel concludes.
Aratis B.V.
Van Nelle factory
Expedition building
Van Nelleweg 1
3044 BC Rotterdam
www.aratis.nl
Question about this story? Ask your question
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- SubjectBouwMat
- CompanyInfraTech