With ten corners, including three chicanes, Circuit Zolder presents a four-kilometre challenge not only for drivers, but also for contractors.

It had been 15 years since the famous circuit last received a new asphalt surface, so it was high time to restore it to its former glory. Main contractor APK and its partners called on Topcon to carry out a 3D survey of the circuit, use 3D milling technology and GPS-guided rollers, and provide intensive support. The result of their joint efforts is a perfect new track surface.

Comfortable and safe driving

David Vanderbeek, responsible for infrastructure at Circuit Zolder: “A circuit’s asphalt needs to be renewed on average every 10 to 15 years. By ‘normal’ standards, the road surface was still in very good condition, but speeds of 230 km/h are reached on this track. At those speeds, every crack and uneven patch in the road has a huge impact. By renewing the circuit, we wanted to improve not only driver safety, but also comfort.”

From scanning the surface to milling: everything in 3D

APK led the project and brought in several partners. Top-Off was first up, milling off the existing asphalt layer. Top-Off and Topcon know each other well: their partnership has been a success for more than 10 years. The decision to use 3D milling for this project too was therefore an easy one. Before the team got started, it surveyed the existing site using an IP-S3, a Topcon mobile mapper.

“Topcon not only carried out the 3D survey of the circuit, but was also closely involved throughout the project. They listened to what we wanted and made adjustments where needed. We could rely on them right through to the final stage.” APK, main contractor for the project 

Using Topcon’s SmoothRide system, key areas such as the chicanes were surveyed accurately in no time. This revealed where the damaged areas were that needed to be repaired to achieve the best possible result. This meant the track could be milled faster and with millimetre accuracy.

“More than 10 years ago, we chose Topcon as our exclusive partner. The successful collaboration at Circuit Zolder is further proof that we make a strong team.” Top-Off, contractor responsible for the milling work at Circuit Zolder

Asphalt paving at the optimum laying temperature and compaction

After milling, APK installed the new kerbs and drainage channels, and it was time for the new asphalt surface. This was laid by Grizaco. As with all top racing circuits, the asphalt mix remains a closely guarded secret. The paving was monitored in real time using Pavelink. This software module made it possible to manage transport planning so that the asphalt remained at the optimum laying temperature throughout the process.
The rollers behind the asphalt pavers were fitted with a Topcon GPS system, ensuring optimum asphalt compaction at Zolder. This was a real added benefit, as several asphalt pavers were working simultaneously. The rollers could therefore work in overlapping passes, while the screed operator could see a colour-coded map showing the number of passes across the circuit live on all screens.

Line marking with a robot

Finally, Ultimated set out the circuit’s line markings, an important element in high-speed races. A robot was used to plot the points and lines. Where GNSS was inadequate, the robot was guided by a Topcon Total Station to mark out the lines. This method is set to prove its worth more often in road construction in the future: it enables work to be carried out not only faster, but also more accurately, flexibly and safely.

A successful test drive

Andy Jaenen, a familiar face in the racing world and an experienced driver, was one of the first to test the circuit after the work was completed. His verdict: “The surface has been levelled nicely and the corners are better, so you now have more grip. That means even faster times and less tyre wear. The new asphalt will make a big difference, especially during races such as the ‘24 Hours of Zolder’.” Large events will have to wait a little longer because of the coronavirus measures, but in the meantime the circuit is open for individual practice sessions. Drivers can already get to know Zolder’s brand-new surface.

Een zakelijke vraag aan Topcon Positioning Netherlands? Get in touch

Who worked on Circuit Zolder

  1. 3D measurementTopconIn this story
  2. main contractorAPKIn this story
  3. milling workTop-OffIn this story
  4. asphalt layerGrizacoIn this story
  5. setting out for line markingUltimatedIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectCircuit Zolder
  • ThemeExtending the life of roads and civil engineering structures
  • SubjectBouwMat
  • CompanyTopcon Positioning Netherlands
  • CompanyAPK
  • CompanyTop-Off
  • CompanyGrizaco
  • CompanyUltimated
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.