On 23 April 2019, the Dutch Senate will consider the Quality Assurance for Construction Bill, followed by a vote. This landmark construction law has attracted considerable attention following the terrible fire at Grenfell Tower in London and the collapse of the car park at Eindhoven Airport. Opponents of privatisation fear similar disasters to those in England, where building control is carried out privately. Supporters of privatisation believe that municipal building control failed in Eindhoven.

Status of the Quality Assurance for Construction Bill

Plans to privatise building control were drawn up more than twenty years ago. The House of Representatives passed the bill by a large majority. However, at the request of former PvdA minister Plasterk, the Senate postponed the vote on 11 July 2017. The CDA has doubts about the PvdA amendments, and without the CDA there is no majority in the Senate. After 658 days, the bill is back before the Senate for a vote, now with D66 minister Ollongren at the helm. The question is whether the CDA will vote down the bill put forward by its coalition partner, the VVD.

The quality assurance system

The key point is that the bill does not change the municipality’s enforcement powers. Municipal building control officers can monitor construction work and, where necessary, take enforcement action.

Speaking to the House of Representatives on 6 December 2018, Ollongren said: ‘It is not accurate to frame this as the privatisation of building control.’ However, primary responsibility for monitoring construction work will lie with a new private quality assurance provider. That does suggest privatisation.

Is this private inspector a case of the fox guarding the henhouse?

No. The quality assurance provider must be independent of the permit holder, architect and contractor. The provider must declare whether the completed building complies with the technical building regulations. The building cannot be occupied without a positive declaration.

Current municipal building control

Municipalities are not currently required to check whether completed buildings comply with the technical building regulations. In practice, such checks are often not carried out. Yet what matters is that the building itself is safe, not just the design on paper.

At present, a municipality can grant an environmental permit (building permit) if it is merely plausible that the building plans on paper comply with the technical building regulations. Once the permit has been granted, the permit holder can submit calculations up to three weeks before construction begins.

The choice to improve quality

There are serious concerns about privatisation. It has a poor reputation in the Netherlands. However, several studies show that smaller municipalities lack the knowledge and expertise needed to ensure adequate building control.

Attempts to improve building control have failed time and again. Increasing permit fees to hire more officers is not an option, as fees are already very high. Another possibility is to pool the work through environmental services, allowing officers to share their knowledge and expertise. However, under the Environment and Planning Act, which is due to come into force on 1 January 2021, building control is not part of the core tasks of environmental services.

That leaves the quality assurance system as the remaining option. How can municipalities now hand over building control? The answer is simple: they do not. A municipal environmental permit is still required, and the municipality can still take enforcement action. The only change is that municipalities will no longer check compliance with the technical building regulations in advance. So, yes, this is not privatisation. Municipalities will also receive the information they need to enforce the regulations. The VNG and minister Ollongren have agreed on this.

MOT test for buildings

Private inspections do not necessarily have to go wrong. Think of the MOT test for cars, carried out by garages. A mandatory private final inspection is still better than no inspection at all.

Of course, municipalities could also carry out that final inspection, but unfortunately they do not have the financial resources. Minister Ollongren is also opposed to municipal final inspections, as they would place greater responsibility on municipalities. Municipalities did not design or build the project, so it is not primarily their role to judge whether a building is safe. If a car crashes shortly after its MOT because of faulty brakes, the garage that carried out the test will be held responsible, at least in the public’s perception.

The bill also increases contractors’ liability and strengthens their duty to warn. Bouwend Nederland is among those opposed. More than half of construction defects originate in the design. Contractors must not be made to pay for them.

Now or never

Politicians want to improve building control to prevent accidents such as the one in Eindhoven. The honest answer is that if the Senate votes down the bill, probably nothing will change for a long time. Minister Ollongren does not intend to submit a supplementary bill to the House of Representatives to amend the original proposal. No alternative has the backing of all parties in the construction sector. Moreover, the construction lobby is very powerful. The bill before the Senate is the compromise that has been reached. In any case, all eyes will soon be on the CDA.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectBouwMat
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.